IDEAS home Printed from https://ideas.repec.org/h/spr/sprchp/978-981-15-8892-1_91.html
   My bibliography  Save this book chapter

Applied Research on BIM+GIS Integration Technology in Subway Project Management

In: Proceedings of the 24th International Symposium on Advancement of Construction Management and Real Estate

Author

Listed:
  • Jin Wang

    (Shenzhen University
    Sino-Australia Joint Research Center in BIM and Smart Construction, Shenzhen University)

  • Jiayuan Wang

    (Shenzhen University
    Sino-Australia Joint Research Center in BIM and Smart Construction, Shenzhen University)

  • Bo Yu

    (Shenzhen University
    Sino-Australia Joint Research Center in BIM and Smart Construction, Shenzhen University)

  • Xingchong Wang

    (Shenzhen University
    Sino-Australia Joint Research Center in BIM and Smart Construction, Shenzhen University)

Abstract

With the development of urbanization, the construction of rail transit has developed rapidly. According to systematic analysis of existing research, 17 potential problems of subway project under the traditional project management mode are identified from the three aspects of cost, schedule and quality. Furthermore, with the semi-structured interview and on-site research, the identified problems could be summarized into 13 items. Aiming at solving the problems like insufficient information construction and information sharing delay in traditional project, this paper proposes a framework of information management cloud platform based on BIM+GIS integration technology: From the perspective of the project life cycle, the data generated in the planning-design-bidding-construction-operation and maintenance process are collected by software integration, and the data are fused by BIM+GIS data fusion interface. In addition, this study deeply analyzes the application of BIM+GIS integration technology in subway project management from three aspects: planning and design, virtual construction, and collaborative management. The research also specifically discuss the application of BIM+GIS technology in Shenzhen subway line to increase the informatization level of subway project construction management and develop the delicacy management with the whole life cycle.

Suggested Citation

  • Jin Wang & Jiayuan Wang & Bo Yu & Xingchong Wang, 2021. "Applied Research on BIM+GIS Integration Technology in Subway Project Management," Springer Books, in: Gui Ye & Hongping Yuan & Jian Zuo (ed.), Proceedings of the 24th International Symposium on Advancement of Construction Management and Real Estate, pages 1297-1310, Springer.
  • Handle: RePEc:spr:sprchp:978-981-15-8892-1_91
    DOI: 10.1007/978-981-15-8892-1_91
    as

    Download full text from publisher

    To our knowledge, this item is not available for download. To find whether it is available, there are three options:
    1. Check below whether another version of this item is available online.
    2. Check on the provider's web page whether it is in fact available.
    3. Perform a search for a similarly titled item that would be available.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:sprchp:978-981-15-8892-1_91. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.