IDEAS home Printed from https://ideas.repec.org/h/spr/sprchp/978-981-15-3977-0_60.html
   My bibliography  Save this book chapter

The Management of Full Life Cycle for Architecture Based on BT and BIM Technology

In: Proceedings of the 23rd International Symposium on Advancement of Construction Management and Real Estate

Author

Listed:
  • Zengwen Bu

    (Shenzhen Cenpoint Architects and Engineers Co., Ltd.)

  • Hong Yang

    (Shenzhen Polytechnic)

  • Xingxiu Wang

    (Shenzhen University)

Abstract

Blockchain Technology (BT) is blank in the construction industry. This paper introduces the basic concepts of technology of Building Information Modeling (BIM) and BT technology, combining the technical difficulties and management difficulties in the process of design, construction, operation and maintenance of buildings, and in order to provide the proposes of the following solutions: In the design stage, BIM’s three-dimensional model was used to integrate with the time and space information of the main materials, components, and products of the building, combined with BT technology, to realize dynamic and real-time management of building information at a low cost. In the construction phase, the use of BT technology to manage the supply chain information flow, instead of logs, records, etc. which depends on the personal means in the construction supervision, to improve the technical level of construction project management, to reduce the quality of man-made and safety risks, to ensure that the construction process material files are not tampered with. BT smart contract management can reduce intermediate subcontracting and project costs. In the operation and maintenance phase, information on building renovations, equipment maintenance, and other changes will be updated through BT and BIM technologies in a timely manner to guarantee that construction assets are updated on a timely basis. This paper uses the literature research method to review domestic and foreign research literatures on BT and project management, to explore new methods of construction project management, and to promote industry progress. This will not only save new tenants’ decoration costs, but also improve equipment maintenance efficiency and quality. The combination of BT and BIM technology will bring about a number of changes in project management technology in the construction industry and improve the overall technical level of the industry.

Suggested Citation

  • Zengwen Bu & Hong Yang & Xingxiu Wang, 2021. "The Management of Full Life Cycle for Architecture Based on BT and BIM Technology," Springer Books, in: Fenjie Long & Sheng Zheng & Yuzhe Wu & Gangying Yang & Yan Yang (ed.), Proceedings of the 23rd International Symposium on Advancement of Construction Management and Real Estate, pages 791-796, Springer.
  • Handle: RePEc:spr:sprchp:978-981-15-3977-0_60
    DOI: 10.1007/978-981-15-3977-0_60
    as

    Download full text from publisher

    To our knowledge, this item is not available for download. To find whether it is available, there are three options:
    1. Check below whether another version of this item is available online.
    2. Check on the provider's web page whether it is in fact available.
    3. Perform a search for a similarly titled item that would be available.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:sprchp:978-981-15-3977-0_60. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.