IDEAS home Printed from https://ideas.repec.org/h/spr/sprchp/978-3-642-35548-6_77.html
   My bibliography  Save this book chapter

An Assessment on Critical Risk Factors for Chinese Engineering Firms in Ghana

In: Proceedings of the 17th International Symposium on Advancement of Construction Management and Real Estate

Author

Listed:
  • Martin Henry Asare

    (South China University of Technology)

  • Yousong Wang

    (South China University of Technology)

Abstract

Construction is one of the main strongholds for development in every country. Its risk assessment is very vital and of prime priority. It is a procedure of fixed assets formation for the economy and an effective construction project determines and expresses economic power and social influence at the national and international front. The objective of the research is basically to identify and establish the most critical aspects of risk factors that influences many of these Chinese engineering firms in Africa. It explores general risks that Chinese engineering firms normally face and have to deal with when embarking on projects in Africa. It also gives a case study on Ghana and subsequently identifies and adopts risk assessment methods to ameliorate and improve safety at various construction sites. By the adoption of questionnaire surveys and statistical analyses in Ghana, being the country used as a case study, risks encountered by Chinese Engineering Firms (CEF) in Africa were identified, assessed and ranked. The study revealed that loss incurred due to political changes, loss due to rise in fuel prices and poor communications between clients were among the highly ranked risks. Among the average risks were increase of material price, cost increase and material shortage. The least encountered risks were breach of contract by project partner and loss due to fluctuation of interest rate. The research findings help to enlighten and outline various risk factors to the Chinese firms who are making their way into Africa for developmental projects and gives pragmatic steps to reduce these risks and ameliorate safety in Construction by the Chinese Engineering Firms (CEF) and other stakeholders. It was found that the critical risk factors for Chinese construction companies in Ghana are technical, political, market and language risks. These findings may also be useful to other firms in Asia and those from different continents since some of the risk factors examined are more general in nature.

Suggested Citation

  • Martin Henry Asare & Yousong Wang, 2014. "An Assessment on Critical Risk Factors for Chinese Engineering Firms in Ghana," Springer Books, in: Jiayuan Wang & Zhikun Ding & Liang Zou & Jian Zuo (ed.), Proceedings of the 17th International Symposium on Advancement of Construction Management and Real Estate, edition 127, chapter 0, pages 743-755, Springer.
  • Handle: RePEc:spr:sprchp:978-3-642-35548-6_77
    DOI: 10.1007/978-3-642-35548-6_77
    as

    Download full text from publisher

    To our knowledge, this item is not available for download. To find whether it is available, there are three options:
    1. Check below whether another version of this item is available online.
    2. Check on the provider's web page whether it is in fact available.
    3. Perform a search for a similarly titled item that would be available.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:sprchp:978-3-642-35548-6_77. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.