Author
Listed:
- Michael Stolle
(Silicon Valley office of McKinsey)
- Ulrich Näher
(Tokyo office of McKinsey & Company)
- Frank Jacob
- Nicolas Reinecke
- James Hexter
(Beijing office of McKinsey & Company)
- Marina Dervisopoulos
Abstract
For most industrial products, the biggest cost factor by far is materials. This means companies can only tap the full potential of a global network if, in addition to having their own manufacturing sites, they also source worldwide as cost-efficiently as possible. It often takes these savings in materials costs to actually make foreign locations attractive in the long term. However, nurturing competent local suppliers is a demanding task that requires patience and intuition. Companies should factor in substantial time and resources for selecting and building suppliers in developing and newly industrialized countries. Planning this process is crucial to realizing these savings. The development of a tailored sourcing strategy begins with segmentation of the materials groups required. The company has to decide (for each category individually) whether to source items locally for the new plant in the medium term or to continue buying from the current supplier. Quality risks and process complexity should be factored in as decision criteria alongside materials costs. Ideally, local sourcing is built up in two phases parallel to relocating production. First, the company realizes quick wins, sourcing parts from local providers who can supply them reliably without intensive preparation and training. As soon as local production is running smoothly, the second phase begins. The aim is to tap the full potential of local sourcing and ensure that more complex parts can also be obtained locally. To achieve this, the manufacturer needs to systematically refine the capabilities of its own sourcing organization in the target country as well as supplier skills. A local supplier structure can only be built up efficiently with a highperformance local sourcing organization.
Suggested Citation
Michael Stolle & Ulrich Näher & Frank Jacob & Nicolas Reinecke & James Hexter & Marina Dervisopoulos, 2008.
"Sourcing: Extending the Footprint Reconfiguration to Suppliers,"
Springer Books, in: Eberhard Abele & Tobias Meyer & Ulrich Näher & Gernot Strube & Richard Sykes (ed.), Global Production, chapter 8, pages 324-348,
Springer.
Handle:
RePEc:spr:sprchp:978-3-540-71653-2_8
DOI: 10.1007/978-3-540-71653-2_8
Download full text from publisher
To our knowledge, this item is not available for
download. To find whether it is available, there are three
options:
1. Check below whether another version of this item is available online.
2. Check on the provider's
web page
whether it is in fact available.
3. Perform a
search for a similarly titled item that would be
available.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:sprchp:978-3-540-71653-2_8. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.