IDEAS home Printed from https://ideas.repec.org/h/spr/lnopch/978-981-99-3626-7_100.html
   My bibliography  Save this book chapter

Job Stress of Chinese Construction Project Management Personnel in Project Overall Implementation Process

In: Proceedings of the 27th International Symposium on Advancement of Construction Management and Real Estate

Author

Listed:
  • Zihao Wang

    (Suzhou University of Science and Technology)

  • Shang Zhang

    (Suzhou University of Science and Technology)

  • Yi Zhu

    (Suzhou University of Science and Technology)

Abstract

The characteristics of modern construction projects, such as tight schedule, a large number of participants and complex working relationship, have significantly increased the job stress of project management personnel. However, there is no research on the change of job stress of construction project management personnel in the overall project implementation process globally. Based on literature review, Job-Demand-Control-Support (JDCS) classical stress theory and questionnaire survey, from the perspective of overall implementation process, this paper explores the changes of job stress levels of construction project management personnel in different stages of project implementation, and analyzes the differences of job stressors between the two types of management personnel of involving and non-involving in construction project overall implementation process. The results show that most of the management personnel experience the highest level of job stress in the tendering stage (36.1%), followed by the commencement stage (26.4%) and the normal construction stage (19.4%). There are significant differences in more than 50% of job stressors between the two types of management personnel. The management personnel involving in overall implementation process feel more strongly influenced by job demand stress, but they can better control their work and receive more support from their superiors and colleagues. The findings are valuable to understand the changing rules of job stress among management personnel involving in project overall implementation process, to develop a more effective job stress management program.

Suggested Citation

  • Zihao Wang & Shang Zhang & Yi Zhu, 2023. "Job Stress of Chinese Construction Project Management Personnel in Project Overall Implementation Process," Lecture Notes in Operations Research, in: Jing Li & Weisheng Lu & Yi Peng & Hongping Yuan & Daikun Wang (ed.), Proceedings of the 27th International Symposium on Advancement of Construction Management and Real Estate, pages 1291-1300, Springer.
  • Handle: RePEc:spr:lnopch:978-981-99-3626-7_100
    DOI: 10.1007/978-981-99-3626-7_100
    as

    Download full text from publisher

    To our knowledge, this item is not available for download. To find whether it is available, there are three options:
    1. Check below whether another version of this item is available online.
    2. Check on the provider's web page whether it is in fact available.
    3. Perform a search for a similarly titled item that would be available.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:lnopch:978-981-99-3626-7_100. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.