IDEAS home Printed from https://ideas.repec.org/h/spr/lnopch/978-981-19-5256-2_1.html
   My bibliography  Save this book chapter

Barriers and Risks in BIM-Embedded Design Collaboration: A Two-Mode Social Network Analysis

In: Proceedings of the 26th International Symposium on Advancement of Construction Management and Real Estate

Author

Listed:
  • Wei Zhang

    (The University of Hong Kong)

Abstract

The construction industry has always been criticized for fragmentation arising from the separated design and construction processes. Although Building Information Modeling (BIM) is considered to be beneficial for effective collaboration through the lifecycle of construction projects, the BIM-embedded design collaboration is still problematic. The aims of this study are a) investigating the relationships between the key risks and barriers in GBA setting from users` perspective, and b) applying the Social Network Analysis (SNA) methods to visualize the barriers and risks in network structure. This paper applies a two-mode social network analysis (SNA) to investigate the key barriers and risks and to understand their relationship in BIM-embedded design collaboration in the Guangdong-Hong Kong-Macao Greater Bay Area (GBA) context. Two independent construction projects were investigated, and five face-to-face and online semi-structured interviews were conducted with experienced design management team members. In this study, the barriers are the reasons that cause the risks, and the risks indicate the poor project performance in BIM-embedded collaboration. Based on the collected dataset, six key barriers as actors and ten risks as the events have been considered; the resultant matrix for investigation is a 6 × 10 matrix, representing a two-mode social network. The results suggest that promoting a collaborative culture is vital for project managers to deliver construction projects in the BIM vision in the company-level. On this basis, the evaluation of company internal design coordination should be taken into account when BIM integration. Moreover, the findings of this research highlight the key barriers as lack of trust and share, fragmented work, multiple silos and different understanding of BIM; plus, the risks of the difficulty in model management, miscommunication and increased short-term reworks received more impacts on impeding BIM-embedded design collaborations. Recommendations were given at the end of this paper for breaking the chains of unfavorable causations for high-quality construction project management.

Suggested Citation

  • Wei Zhang, 2022. "Barriers and Risks in BIM-Embedded Design Collaboration: A Two-Mode Social Network Analysis," Lecture Notes in Operations Research, in: Hongling Guo & Dongping Fang & Weisheng Lu & Yi Peng (ed.), Proceedings of the 26th International Symposium on Advancement of Construction Management and Real Estate, pages 3-13, Springer.
  • Handle: RePEc:spr:lnopch:978-981-19-5256-2_1
    DOI: 10.1007/978-981-19-5256-2_1
    as

    Download full text from publisher

    To our knowledge, this item is not available for download. To find whether it is available, there are three options:
    1. Check below whether another version of this item is available online.
    2. Check on the provider's web page whether it is in fact available.
    3. Perform a search for a similarly titled item that would be available.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:lnopch:978-981-19-5256-2_1. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.