IDEAS home Printed from https://ideas.repec.org/h/spr/isochp/978-0-387-33117-1_7.html
   My bibliography  Save this book chapter

A Practical View of the Complexity in Developing Master Production Schedules: Fundamentals, Examples, and Implementation

In: Handbook of Production Scheduling

Author

Listed:
  • Guilherme Emani Vieira

    (Pontifical Catholic University of Parana)

Abstract

Although Master Production Scheduling (MPS) has been studied and used by both academia and industries for quite a long time, the real complexity involved in making a master plan when capacity is limited, when products have the flexibility of being made at different production lines, and when performance goals are tight and conflicting, has not yet been presented in the literature in a simple and practical way. In this context, one should consider how to attain a given performance by balancing different objectives, such as maximizing service level, and minimizing inventory levels, risk of stockouts, overtime, and setup time. Many decisions need to be made during the development of an MPS, such as: Which product should be scheduled, in what quantity, and to which resource? Is overtime needed? Should inventory be built for future periods? Should backlogging be considered? Clearly, an MPS process depends on the combination of many different parameters. For this type of problem, it is extremely difficult to find a solution that satisfies all objectives involved simultaneously, mainly because of the great number of variables involved. It is known that finding an optimal MPS solution for industrial scheduling scenarios is time consuming - despite nowadays computers being extremely fast. It is common, therefore, to use heuristics (or meta-heuristics) to find good plans in reasonable computer time. Using a plain language, this chapter describes some of the complexity involved in the MPS creation without, however, paying too much attention to mathematical formalisms and definitions, using mostly the author’s industry experience and practical examples faced during research in the production scheduling area.

Suggested Citation

  • Guilherme Emani Vieira, 2006. "A Practical View of the Complexity in Developing Master Production Schedules: Fundamentals, Examples, and Implementation," International Series in Operations Research & Management Science, in: Jeffrey W. Herrmann (ed.), Handbook of Production Scheduling, chapter 0, pages 149-176, Springer.
  • Handle: RePEc:spr:isochp:978-0-387-33117-1_7
    DOI: 10.1007/0-387-33117-4_7
    as

    Download full text from publisher

    To our knowledge, this item is not available for download. To find whether it is available, there are three options:
    1. Check below whether another version of this item is available online.
    2. Check on the provider's web page whether it is in fact available.
    3. Perform a search for a similarly titled item that would be available.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Körpeoglu, Ersin & Yaman, Hande & Selim Aktürk, M., 2011. "A multi-stage stochastic programming approach in master production scheduling," European Journal of Operational Research, Elsevier, vol. 213(1), pages 166-179, August.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:isochp:978-0-387-33117-1_7. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.