Robust Multi-Criteria Project Scheduling in Plant Engineering and Construction

In: Handbook on Project Management and Scheduling Vol. 2

Author

Listed:
  • Maurizio Bevilacqua

    (Marche Polytechnic University)

  • Filippo E. Ciarapica

    (Marche Polytechnic University)

  • Giovanni Mazzuto

    (Marche Polytechnic University)

  • Claudia Paciarotti

    (Marche Polytechnic University)

Abstract

In this chapter we consider a real-life problem which consists in scheduling the activities of a project subject to precedence and resource constraints so as to optimize several conflicting goals. The durations of the activities cannot be specified precisely in advance. Rather, we assume that based on the experience with previous projects, the means, the standard deviations, and certain percentiles of the respective probability distributions can be reliably estimated. The algorithm applied to solve this problem relies on goal programming techniques in conjunction with Goldratt’s Critical Chain Project Management (CCPM) method. The algorithm was applied to a case study dealing with the construction of an accommodation module for an oil rig. Goal programming is a multi-objective programming technique which attempts to minimize the deviations to a set of target values for the given objectives in such a way that all operational restrictions of the problem are satisfied. Several solutions can be obtained, and the best solution will depend on the priority associated to each goal. In this work we considered the minimization of the project makespan and the levelling of the project resources as the objectives to be pursued. The results obtained using the proposed algorithm have been compared with classical project management techniques (PERT/CPM) that the company involved in the case study used in many projects.

Suggested Citation

  • Maurizio Bevilacqua & Filippo E. Ciarapica & Giovanni Mazzuto & Claudia Paciarotti, 2015. "Robust Multi-Criteria Project Scheduling in Plant Engineering and Construction," International Handbooks on Information Systems, in: Christoph Schwindt & Jürgen Zimmermann (ed.), Handbook on Project Management and Scheduling Vol. 2, edition 127, chapter 0, pages 1291-1305, Springer.
  • Handle: RePEc:spr:ihichp:978-3-319-05915-0_28
    DOI: 10.1007/978-3-319-05915-0_28
    as

    Download full text from publisher

    To our knowledge, this item is not available for download. To find whether it is available, there are three options:
    1. Check below whether another version of this item is available online.
    2. Check on the provider's web page whether it is in fact available.
    3. Perform a search for a similarly titled item that would be available.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Farnaz Torabi Yeganeh & Seyed Hessameddin Zegordi, 2020. "A multi-objective optimization approach to project scheduling with resiliency criteria under uncertain activity duration," Annals of Operations Research, Springer, vol. 285(1), pages 161-196, February.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:spr:ihichp:978-3-319-05915-0_28. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Sonal Shukla or Springer Nature Abstracting and Indexing (email available below). General contact details of provider: http://www.springer.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.