Norman Keith Womer
Personal Details
First Name: | Norman |
Middle Name: | Keith |
Last Name: | Womer |
Suffix: | |
RePEc Short-ID: | pwo241 |
[This author has chosen not to make the email address public] | |
Affiliation
(50%) College of Business
University of Missouri-St. Louis
St. Louis, Missouri (United States)http://www.umsl.edu/divisions/business/
RePEc:edi:cbumsus (more details at EDIRC)
(50%) Department of Economics
University of Missouri-St. Louis
St. Louis, Missouri (United States)http://www.umsl.edu/~econ/
RePEc:edi:edumsus (more details at EDIRC)
Research output
Jump to: ArticlesArticles
- Alidaee, Bahram & Li, Haitao & Wang, Haibo & Womer, Keith, 2021. "Integer programming formulations in sequencing with total earliness and tardiness penalties, arbitrary due dates, and no idle time: A concise review and extension," Omega, Elsevier, vol. 103(C).
- Womer, K. & Li, H. & Camm, J. & Osterman, C. & Radhakrishnan, R., 2017. "Learning and Bayesian updating in long cycle made-to-order (MTO) production," Omega, Elsevier, vol. 69(C), pages 29-42.
- Norman K. Womer, 2016. "Multiple local optima for seemingly unrelated regression models," International Journal of Computational Economics and Econometrics, Inderscience Enterprises Ltd, vol. 6(1), pages 44-55.
- Li, Haitao & Womer, Norman K., 2015. "Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming," European Journal of Operational Research, Elsevier, vol. 246(1), pages 20-33.
- Li, Haitao & Womer, Keith, 2012. "Optimizing the supply chain configuration for make-to-order manufacturing," European Journal of Operational Research, Elsevier, vol. 221(1), pages 118-128.
- Haitao Li & Keith Womer, 2007. "A model and procedure for competitive bidding under resource constraints," International Journal of Operational Research, Inderscience Enterprises Ltd, vol. 2(4), pages 452-480.
- N. Womer & M.-L. Bougnol & J. Dula & D. Retzlaff-Roberts, 2006. "Benefit-cost analysis using data envelopment analysis," Annals of Operations Research, Springer, vol. 145(1), pages 229-250, July.
- M-L Bougnol & J H Dulá & D Retzlaff-Roberts & N K Womer, 2005. "Nonparametric frontier analysis with multiple constituencies," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 56(3), pages 252-266, March.
- Norman Keith Womer & Homee Shroff & Thomas Gulledge & Kingsley Haynes, 2003. "Measuring efficiency with a linear economic model," Applied Economics, Taylor & Francis Journals, vol. 35(13), pages 1459-1467.
- B Alidaee & N K Womer, 1999. "Scheduling with time dependent processing times: Review and extensions," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 50(7), pages 711-720, July.
- Caporaletti, L. E. & Dulá, J. H. & Womer, N. K., 1999. "Performance evaluation based on multiple attributes with nonparametric frontiers," Omega, Elsevier, vol. 27(6), pages 637-645, December.
- Blenman, L. P. & Cantrell, R. S. & Fennell, R. E. & Parker, D. F. & Reneke, J. A. & Wang, L. F. S. & Womer, N. K., 1995. "An alternative approach to stochastic calculus for economic and financial models," Journal of Economic Dynamics and Control, Elsevier, vol. 19(3), pages 553-568, April.
- James R. Dorroh & Thomas R. Gulledge & Norman K. Womer, 1994. "Investment in Knowledge: A Generalization of Learning By Experience," Management Science, INFORMS, vol. 40(8), pages 947-958, August.
- Camm, Jeffrey D. & Gulledge, Thomas R. & Womer, Norman Keith, 1993. "Cost analysis in the time domain," European Journal of Operational Research, Elsevier, vol. 68(3), pages 334-343, August.
- Norman Keith Womer, 1991. "Introduction to the Special Issue on Military Applications," Interfaces, INFORMS, vol. 21(4), pages 1-1, August.
- Gulledge, Thomas Jr. & Womer, Norman Keith, 1990. "Learning curves and production functions: An integration," Engineering Costs and Production Economics, Elsevier, vol. 20(1), pages 3-12, July.
- K. T. Wallenius & N. K. Womer, 1989. "Cost realism in defense contracting," Naval Research Logistics (NRL), John Wiley & Sons, vol. 36(5), pages 533-557, October.
- Stephen J. Balut & Thomas R. Gulledge & Norman Keith Womer, 1989. "A Method for Repricing Aircraft Procurement Programs," Operations Research, INFORMS, vol. 37(2), pages 255-265, April.
- Gordon W. Arbogast & Norman Keith Womer, 1988. "An error components model of cost overruns and schedule slip on army R&D programs," Naval Research Logistics (NRL), John Wiley & Sons, vol. 35(3), pages 367-382, June.
- Gulledge, Thomas Jr. & Womer, Norman Keith & Camm, Jeffrey D., 1987. "Learning and production costs: An application of a cost prediction model to a fighter airframe program," Engineering Costs and Production Economics, Elsevier, vol. 12(1-4), pages 389-400, July.
- Womer, Norman Keith & Patterson, J Wayne, 1987. "A New Model for Learning Curves, DARM: Comment," Journal of Business & Economic Statistics, American Statistical Association, vol. 5(3), pages 336-337, July.
- Keith Womer, Norman & Stephen Cantrell, R., 1987. "The demand for risky assets under uncertain inflation : An examination of some widely used assumptions," Journal of Economics and Business, Elsevier, vol. 39(4), pages 357-362, November.
- Jeffrey D. Camm & Norman Keith Womer, 1987. "The cost of production breaks," Naval Research Logistics (NRL), John Wiley & Sons, vol. 34(2), pages 199-205, April.
- Dorroh, James R. & Gulledge, Thomas R. & Womer, Norman Keith, 1986. "A generalization of the learning curve," European Journal of Operational Research, Elsevier, vol. 26(2), pages 205-216, August.
- Norman Keith Womer, 1984. "Estimating Learning Curves from Aggregate Monthly Data," Management Science, INFORMS, vol. 30(8), pages 982-992, August.
- Womer, N Keith & Patterson, J Wayne, 1983. "Estimation and Testing of Learning Curves," Journal of Business & Economic Statistics, American Statistical Association, vol. 1(4), pages 265-272, October.
- Womer, Norman K. & Gulledge, Thomas Jr, 1983. "A dynamic cost function for an airframe production program," Engineering Costs and Production Economics, Elsevier, vol. 7(3), pages 213-227, September.
- Norman Keith Womer, 1979. "Learning Curves, Production Rate, and Program Costs," Management Science, INFORMS, vol. 25(4), pages 312-319, April.
- Womer, Norman K., 1973. "Lancaster's version of the Walras-Wald model," Journal of Economic Theory, Elsevier, vol. 6(5), pages 515-519, October.
More information
Research fields, statistics, top rankings, if available.Statistics
Access and download statistics for all items
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. For general information on how to correct material on RePEc, see these instructions.
To update listings or check citations waiting for approval, Norman Keith Womer should log into the RePEc Author Service.
To make corrections to the bibliographic information of a particular item, find the technical contact on the abstract page of that item. There, details are also given on how to add or correct references and citations.
To link different versions of the same work, where versions have a different title, use this form. Note that if the versions have a very similar title and are in the author's profile, the links will usually be created automatically.
Please note that most corrections can take a couple of weeks to filter through the various RePEc services.