Method of planning construction projects, taking into account risk factors

Author

Listed:
  • Dariusz Skorupka

Abstract

This paper presents an original method of planning construction projects, taking into account the influence of potential risk factors. The method is called the Method of Construction Risk Assessment (MOCRA). According to this method, first the material-financial plan of a project (a construction project in the example provided) is analyzed. Then risk factors are identified, taking into account the project’s specificity. The end result of this stage is a list of risk factors. In the third stage the risk is reduced or minimized where possible. Finally, the specified risk factors are quantified, which is a difficult task. The effectiveness of the risk assessment depends on how thoroughly this task is carried out. Since point scale assessment of risk does not appeal to engineers, in MOCRA quantified risk is allocated in the material-financial plan. Thanks to this, one can prepare contingency plans, i.e. plans (action variants) to be implemented when particular risk factors occur. Having completed the project, one can use MOCRA to check the accuracy of the assessment (forecast) and select the best contingency action variant, whereby the method’s effectiveness in planning future projects is improved.

Suggested Citation

  • Dariusz Skorupka, 2009. "Method of planning construction projects, taking into account risk factors," Operations Research and Decisions, Wroclaw University of Science and Technology, Faculty of Management, vol. 19(3), pages 119-128.
  • Handle: RePEc:wut:journl:v:3:y:2009:p:119-128
    as

    Download full text from publisher

    File URL: https://ord.pwr.edu.pl/assets/papers_archive/141%20-%20published.pdf
    Download Restriction: no
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Dorota Kuchta, 2012. "Application of fuzzy numbers to the estimation of an ongoing project's completion time," Operations Research and Decisions, Wroclaw University of Science and Technology, Faculty of Management, vol. 22(4), pages 87-103.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wut:journl:v:3:y:2009:p:119-128. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Adam Kasperski (email available below). General contact details of provider: https://edirc.repec.org/data/iopwrpl.html .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.