Author
Listed:
- Vicent Hernández-Chover
(Institute of Local Development (ILD-WATER), Water Economics Group, University of Valencia, Avda. Tarongers S/N, Valencia 46022, Spain)
- Lledó Castellet-Viciano
(Institute of Local Development (ILD-WATER), Water Economics Group, University of Valencia, Avda. Tarongers S/N, Valencia 46022, Spain)
- Francesc Hernández-Sancho
(Institute of Local Development (ILD-WATER), Water Economics Group, University of Valencia, Avda. Tarongers S/N, Valencia 46022, Spain)
Abstract
Optimal management is usually at the top of the concerns in the context of water infrastructures. In the specific domain of wastewater treatment plants (WWTPs), European Directive 91/271 established the need of implementing a biological treatment of wastewater leading to an intensive construction of WWTPs in several European countries, which now present important problems of maintenance. These facilities are composed of different types of assets, which should be managed efficiently in order to optimize the performance of the processes as well as the maintenance and replacement costs of the equipment. In fact, the deterioration of these assets increases the operational risk and endangers the continuity of the service of these WWTPs. In this paper, the authors combine multicriteria methodologies (MCDM) and economic aspects of the equipment to define an appropriate technical–economical replacement policy. With the aim of developing a reference procedure in the wastewater sector, an approach has been made to blower pump, which is an equipment widely used in WWTPs to provide a continuous air flow to the reactor facilitating the elimination of organic matter and the nutrients contained in the wastewater. The proposal integrates aspects such as acquisition costs and corrective maintenance, interest rate, and amortization based on the condition of the equipment.
Suggested Citation
Vicent Hernández-Chover & Lledó Castellet-Viciano & Francesc Hernández-Sancho, 2021.
"Operational Indicators to Manage the Replacement of Electromechanical Equipment in Wastewater Treatment Facilities,"
International Journal of Information Technology & Decision Making (IJITDM), World Scientific Publishing Co. Pte. Ltd., vol. 20(06), pages 1637-1656, November.
Handle:
RePEc:wsi:ijitdm:v:20:y:2021:i:06:n:s0219622021500437
DOI: 10.1142/S0219622021500437
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wsi:ijitdm:v:20:y:2021:i:06:n:s0219622021500437. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Tai Tone Lim (email available below). General contact details of provider: http://www.worldscinet.com/ijitdm/ijitdm.shtml .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.