IDEAS home Printed from https://ideas.repec.org/a/wsi/ijitdm/v19y2020i04ns0219622020500212.html
   My bibliography  Save this article

Hybrid Gaussian Process Inference Model for Construction Management Decision Making

Author

Listed:
  • Min-Yuan Cheng

    (Department of Civil and Construction Engineering, National Taiwan University of Science and Technology, #43, Sec. 4, Keelung Rd., Taipei, Taiwan)

  • Yu-Wei Wu

    (Department of Civil and Construction Engineering, National Taiwan University of Science and Technology, #43, Sec. 4, Keelung Rd., Taipei, Taiwan)

  • Chin-Chi Huang

    (Department of Civil and Construction Engineering, National Taiwan University of Science and Technology, #43, Sec. 4, Keelung Rd., Taipei, Taiwan)

Abstract

Construction decision-making often involves several indefinite factors, and wrong decisions usually lead to many losses and may even cause the construction to fail. Correct policy making is very important. Construction decision making used to depend on managerial staff’ experience and subjective recognition, but this approach is likely to bring about wrong decisions because of an excessive number of factors involved or biased subjective recognition. To prevent such a situation, this study establishes a Hybrid Gaussian Process Inference Model (HGPIM), which uses a Gaussian process (GP) to sort out the mapping relationship between data input and output. It also uses Bayesian inference together with particle swarm optimization (PSO) to optimize the hyper-parameters of the covariance function in GP to obtain the best inference predictive ability. By predicting with the model and giving the events that need to be decided an expected value and a variance, we can establish the data’s confidence interval as a reference for making decisions. This study collects data from three construction projects to conduct the experiment and uses HGPIM to train, predict and retest these cases to prove HGPIMs predictive ability. It also shows that the model can be applied to various cases and data and thus can be applied to construction engineering.

Suggested Citation

  • Min-Yuan Cheng & Yu-Wei Wu & Chin-Chi Huang, 2020. "Hybrid Gaussian Process Inference Model for Construction Management Decision Making," International Journal of Information Technology & Decision Making (IJITDM), World Scientific Publishing Co. Pte. Ltd., vol. 19(04), pages 1015-1036, July.
  • Handle: RePEc:wsi:ijitdm:v:19:y:2020:i:04:n:s0219622020500212
    DOI: 10.1142/S0219622020500212
    as

    Download full text from publisher

    File URL: http://www.worldscientific.com/doi/abs/10.1142/S0219622020500212
    Download Restriction: Access to full text is restricted to subscribers

    File URL: https://libkey.io/10.1142/S0219622020500212?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wsi:ijitdm:v:19:y:2020:i:04:n:s0219622020500212. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Tai Tone Lim (email available below). General contact details of provider: http://www.worldscinet.com/ijitdm/ijitdm.shtml .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.