IDEAS home Printed from https://ideas.repec.org/a/wsi/apjorx/v25y2008i06ns0217595908002036.html
   My bibliography  Save this article

A Maintenance Model For Manufacturing Lead Time In A Production System With Bmap Input And Bilevel Setup Control

Author

Listed:
  • HO WOO LEE

    (Dept. of Systems Management Engineering, Sungkyunkwan University, Suwon, Korea)

  • NO IK PARK

    (Converged Network Architecture Research Team, Network Research Division, Broadcasting & Telecommunications Convergence Research Laboratory, ETRI, Daejon, Korea)

Abstract

In this paper, the manufacturing lead time in a production system with maintenance period, non-renewal BMAP (Batch Markovian Arrival process) input and bilevel threshold control is analyzed. The factorization principle is used to derive the distribution of the manufacturing lead time and the mean value. A numerical example is provided to see the effect of the non-renewal input on the system performance.

Suggested Citation

  • Ho Woo Lee & No Ik Park, 2008. "A Maintenance Model For Manufacturing Lead Time In A Production System With Bmap Input And Bilevel Setup Control," Asia-Pacific Journal of Operational Research (APJOR), World Scientific Publishing Co. Pte. Ltd., vol. 25(06), pages 807-825.
  • Handle: RePEc:wsi:apjorx:v:25:y:2008:i:06:n:s0217595908002036
    DOI: 10.1142/S0217595908002036
    as

    Download full text from publisher

    File URL: http://www.worldscientific.com/doi/abs/10.1142/S0217595908002036
    Download Restriction: Access to full text is restricted to subscribers

    File URL: https://libkey.io/10.1142/S0217595908002036?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    References listed on IDEAS

    as
    1. Karmeshu, 1988. "Demographic Models of Urbanization," Environment and Planning B, , vol. 15(1), pages 47-54, March.
    2. Abegaz, B.,, 1988. "Manpower requirements models : a synthesis," ILO Working Papers 992629673402676, International Labour Organization.
    3. repec:ilo:ilowps:262967 is not listed on IDEAS
    Full references (including those not matched with items on IDEAS)

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Chen, Yanguang, 2014. "Urban chaos and replacement dynamics in nature and society," Physica A: Statistical Mechanics and its Applications, Elsevier, vol. 413(C), pages 373-384.
    2. repec:ilo:ilowps:264052 is not listed on IDEAS
    3. Collier P., 1988. "African public sector retrenchment: an analytical survey," ILO Working Papers 992640523402676, International Labour Organization.
    4. Chen, Yanguang & Huang, Linshan, 2019. "Modeling growth curve of fractal dimension of urban form of Beijing," Physica A: Statistical Mechanics and its Applications, Elsevier, vol. 523(C), pages 1038-1056.

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wsi:apjorx:v:25:y:2008:i:06:n:s0217595908002036. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Tai Tone Lim (email available below). General contact details of provider: http://www.worldscinet.com/apjor/apjor.shtml .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.