IDEAS home Printed from https://ideas.repec.org/a/wly/riskan/v20y2000i1p113-124.html
   My bibliography  Save this article

Risk of Extreme Events in Multiobjective Decision Trees Part 1. Severe Events

Author

Listed:
  • Hendrik I. Frohwein
  • James H. Lambert

Abstract

Earlier work with decision trees identified nonseparability as an obstacle to minimizing the conditional expected value, a measure of the risk of extreme events, by the well‐known method of averaging out and folding back. This first of two companion papers addresses the conditional expected value that is defined as the expected outcome assuming the exceedance of a threshold β, where β is preselected by the decision maker. An approach is proposed to overcome the need to evaluate all policies in order to identify the optimal policy. The approach is based on the insight that the conditional expected value is separable into two constituent elements of risk and can thus be optimized along with other objectives, including the unconditional expected value of the outcome, by using a multiobjective decision tree. An example of sequential decision making for improving highway capacity is given.

Suggested Citation

  • Hendrik I. Frohwein & James H. Lambert, 2000. "Risk of Extreme Events in Multiobjective Decision Trees Part 1. Severe Events," Risk Analysis, John Wiley & Sons, vol. 20(1), pages 113-124, February.
  • Handle: RePEc:wly:riskan:v:20:y:2000:i:1:p:113-124
    DOI: 10.1111/0272-4332.00011
    as

    Download full text from publisher

    File URL: https://doi.org/10.1111/0272-4332.00011
    Download Restriction: no

    File URL: https://libkey.io/10.1111/0272-4332.00011?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Nilesh N. Joshi & James H. Lambert, 2011. "Diversification of infrastructure projects for emergent and unknown non-systematic risks," Journal of Risk Research, Taylor & Francis Journals, vol. 14(6), pages 717-733, June.
    2. Barry M. Horowitz & Yacov Y. Haimes, 2003. "Risk‐based methodology for scenario tracking, intelligence gathering, and analysis for countering terrorism," Systems Engineering, John Wiley & Sons, vol. 6(3), pages 152-169.
    3. Kash Barker & Kaycee J. Wilson, 2012. "Decision Trees with Single and Multiple Interval-Valued Objectives," Decision Analysis, INFORMS, vol. 9(4), pages 348-358, December.
    4. Barker, Kash & Haimes, Yacov Y., 2009. "Assessing uncertainty in extreme events: Applications to risk-based decision making in interdependent infrastructure sectors," Reliability Engineering and System Safety, Elsevier, vol. 94(4), pages 819-829.
    5. Michael Greenberg & Charles Haas & Anthony Cox & Karen Lowrie & Katherine McComas & Warner North, 2012. "Ten Most Important Accomplishments in Risk Analysis, 1980–2010," Risk Analysis, John Wiley & Sons, vol. 32(5), pages 771-781, May.
    6. Frini, Anissa & Guitouni, Adel & Martel, Jean-Marc, 2012. "A general decomposition approach for multi-criteria decision trees," European Journal of Operational Research, Elsevier, vol. 220(2), pages 452-460.
    7. Altay, Nezih & Green III, Walter G., 2006. "OR/MS research in disaster operations management," European Journal of Operational Research, Elsevier, vol. 175(1), pages 475-493, November.
    8. Ruth Y. Dicdican & Yacov Y. Haimes, 2005. "Relating multiobjective decision trees to the multiobjective risk impact analysis method," Systems Engineering, John Wiley & Sons, vol. 8(2), pages 95-108.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:riskan:v:20:y:2000:i:1:p:113-124. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1111/(ISSN)1539-6924 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.