Analysis of a machine repair problem with an unreliable server and phase type repairs and services
Author
Abstract
Suggested Citation
DOI: 10.1002/nav.10069
Download full text from publisher
References listed on IDEAS
- Wartenhorst, Pieter, 1995. "N parallel queueing systems with server breakdown and repair," European Journal of Operational Research, Elsevier, vol. 82(2), pages 302-322, April.
- Tapani Lehtonen, 1984. "On the optimal policies of an exponential machine repair problem," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 31(2), pages 173-181, June.
- F. A. Van Der Duyn Schouten & P. Wartenhorst, 1993. "A two‐machine repair model with variable repair rate," Naval Research Logistics (NRL), John Wiley & Sons, vol. 40(4), pages 495-523, June.
- Frostig, Esther, 1999. "Jointly optimal allocation of a repairman and optimal control of service rate for machine repairman problem," European Journal of Operational Research, Elsevier, vol. 116(2), pages 274-280, July.
- B. D. Sivazlian & K. H. Wang, 1990. "Diffusion approximation to the G/G/R machine repair problem with warm standby spares," Naval Research Logistics (NRL), John Wiley & Sons, vol. 37(5), pages 753-772, October.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Pedram Sahba & Bariş Balciog̃lu & Dragan Banjevic, 2013. "Analysis of the finite‐source multiclass priority queue with an unreliable server and setup time," Naval Research Logistics (NRL), John Wiley & Sons, vol. 60(4), pages 331-342, June.
- Pedram Sahba & Barış Balcıog̃lu & Dragan Banjevic, 2022. "The impact of disruption characteristics on the performance of a server," Annals of Operations Research, Springer, vol. 317(1), pages 239-252, October.
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Haque, Lani & Armstrong, Michael J., 2007. "A survey of the machine interference problem," European Journal of Operational Research, Elsevier, vol. 179(2), pages 469-482, June.
- K. H. Adjallah & K. P. Adzakpa, 2007. "Minimizing maintenance cost involving flow-time and tardiness penalty with unequal release dates," Journal of Risk and Reliability, , vol. 221(1), pages 57-65, March.
- Doroudi, Sherwin & Avgerinos, Thanassis & Harchol-Balter, Mor, 2021. "To clean or not to clean: Malware removal strategies for servers under load," European Journal of Operational Research, Elsevier, vol. 292(2), pages 596-609.
- Shengli Lv, 2021. "Multi-Machine Repairable System with One Unreliable Server and Variable Repair Rate," Mathematics, MDPI, vol. 9(11), pages 1-16, June.
- Tan, Baris, 1998. "Effects of variability on the due-time performance of a continuous materials flow production system in series," International Journal of Production Economics, Elsevier, vol. 54(1), pages 87-100, January.
- Delasay, Mohammad & Kolfal, Bora & Ingolfsson, Armann, 2012. "Maximizing throughput in finite-source parallel queue systems," European Journal of Operational Research, Elsevier, vol. 217(3), pages 554-559.
- Mohammad Firouz & Linda Li & Burcu B. Keskin, 2022. "Managing equipment rentals: Unreliable fleet, impatient customers, and finite commitment capacity," Production and Operations Management, Production and Operations Management Society, vol. 31(11), pages 3963-3981, November.
- Zhou, Wenhui & Zheng, Zhibin & Xie, Wei, 2017. "A control-chart-based queueing approach for service facility maintenance with energy-delay tradeoff," European Journal of Operational Research, Elsevier, vol. 261(2), pages 613-625.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:navres:v:50:y:2003:i:5:p:462-480. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)1520-6750 .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.