IDEAS home Printed from https://ideas.repec.org/a/wly/navres/v38y1991i3p413-430.html
   My bibliography  Save this article

Distance‐directed augmenting path algorithms for maximum flow and parametric maximum flow problems

Author

Listed:
  • Ravindra K. Ahuja
  • James B. Orlin

Abstract

Until recently, fast algorithms for the maximum flow problem have typically proceeded by constructing layered networks and establishing blocking flows in these networks. However, in recent years, new distance‐directed algorithms have been suggested that do not construct layered networks but instead maintain a distance label with each node. The distance label of a node is a lower bound on the length of the shortest augmenting path from the node to the sink. In this article we develop two distance‐directed augmenting path algorithms for the maximum flow problem. Both the algorithms run in O(n2m) time on networks with n nodes and m arcs. We also point out the relationship between the distance labels and layered networks. Using a scaling technique, we improve the complexity of our distance‐directed algorithms to O(nm log U), where U denotes the largest arc capacity. We also consider applications of these algorithms to unit capacity maximum flow problems and a class of parametric maximum flow problems.

Suggested Citation

  • Ravindra K. Ahuja & James B. Orlin, 1991. "Distance‐directed augmenting path algorithms for maximum flow and parametric maximum flow problems," Naval Research Logistics (NRL), John Wiley & Sons, vol. 38(3), pages 413-430, June.
  • Handle: RePEc:wly:navres:v:38:y:1991:i:3:p:413-430
    DOI: 10.1002/1520-6750(199106)38:33.0.CO;2-J
    as

    Download full text from publisher

    File URL: https://doi.org/10.1002/1520-6750(199106)38:33.0.CO;2-J
    Download Restriction: no

    File URL: https://libkey.io/10.1002/1520-6750(199106)38:33.0.CO;2-J?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    References listed on IDEAS

    as
    1. R. K. Ahuja, 1986. "Algorithms for the minimax transportation problem," Naval Research Logistics Quarterly, John Wiley & Sons, vol. 33(4), pages 725-739, November.
    2. R. K. Ahuja & James B. Orlin, 1989. "A Fast and Simple Algorithm for the Maximum Flow Problem," Operations Research, INFORMS, vol. 37(5), pages 748-759, October.
    3. Edward Minieka, 1972. "Parametric Network Flows," Operations Research, INFORMS, vol. 20(6), pages 1162-1170, December.
    4. James E. Kelley, 1961. "Critical-Path Planning and Scheduling: Mathematical Basis," Operations Research, INFORMS, vol. 9(3), pages 296-320, June.
    Full references (including those not matched with items on IDEAS)

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Antonio Sedeño‐Noda & Carlos González‐Martín, 2000. "A O(nm log(U/n)) time maximum flow algorithm," Naval Research Logistics (NRL), John Wiley & Sons, vol. 47(6), pages 511-520, September.
    2. Ahuja, Ravindra K. & Kodialam, Murali & Mishra, Ajay K. & Orlin, James B., 1997. "Computational investigations of maximum flow algorithms," European Journal of Operational Research, Elsevier, vol. 97(3), pages 509-542, March.
    3. Sedeño-Noda, A. & González-Dávila, E. & González-Martín, C. & González-Yanes, A., 2009. "Preemptive benchmarking problem: An approach for official statistics in small areas," European Journal of Operational Research, Elsevier, vol. 196(1), pages 360-369, July.
    4. A. Sedeño-Noda & M. González-Sierra & C. González-Martín, 2000. "An algorithmic study of the Maximum Flow problem: A comparative statistical analysis," TOP: An Official Journal of the Spanish Society of Statistics and Operations Research, Springer;Sociedad de Estadística e Investigación Operativa, vol. 8(1), pages 135-162, June.

    Most related items

    These are the items that most often cite the same works as this one and are cited by the same works as this one.
    1. Mehrnoosh Zohrehvandi & Shakib Zohrehvandi & Mohammad Khalilzadeh & Maghsoud Amiri & Fariborz Jolai & Edmundas Kazimieras Zavadskas & Jurgita Antucheviciene, 2024. "A Multi-Objective Mathematical Programming Model for Project-Scheduling Optimization Considering Customer Satisfaction in Construction Projects," Mathematics, MDPI, vol. 12(2), pages 1-16, January.
    2. A B Hafızoğlu & M Azizoğlu, 2010. "Linear programming based approaches for the discrete time/cost trade-off problem in project networks," Journal of the Operational Research Society, Palgrave Macmillan;The OR Society, vol. 61(4), pages 676-685, April.
    3. Herroelen, Willy & Leus, Roel, 2004. "The construction of stable project baseline schedules," European Journal of Operational Research, Elsevier, vol. 156(3), pages 550-565, August.
    4. Geng, Zhichao & Yuan, Jinjiang, 2023. "Single-machine scheduling of multiple projects with controllable processing times," European Journal of Operational Research, Elsevier, vol. 308(3), pages 1074-1090.
    5. Zhen Song & Håkan Schunnesson & Mikael Rinne & John Sturgul, 2015. "An Approach to Realizing Process Control for Underground Mining Operations of Mobile Machines," PLOS ONE, Public Library of Science, vol. 10(6), pages 1-17, June.
    6. Manuel A. Alba Martínez & Jean-François Cordeau & Mauro Dell'Amico & Manuel Iori, 2013. "A Branch-and-Cut Algorithm for the Double Traveling Salesman Problem with Multiple Stacks," INFORMS Journal on Computing, INFORMS, vol. 25(1), pages 41-55, February.
    7. Shiho Morishita & Takao Nishizeki, 2015. "Parametric power supply networks," Journal of Combinatorial Optimization, Springer, vol. 29(1), pages 1-15, January.
    8. Trietsch, Dan & Mazmanyan, Lilit & Gevorgyan, Lilit & Baker, Kenneth R., 2012. "Modeling activity times by the Parkinson distribution with a lognormal core: Theory and validation," European Journal of Operational Research, Elsevier, vol. 216(2), pages 386-396.
    9. Wauters, Mathieu & Vanhoucke, Mario, 2017. "A Nearest Neighbour extension to project duration forecasting with Artificial Intelligence," European Journal of Operational Research, Elsevier, vol. 259(3), pages 1097-1111.
    10. Gehring, Marco & Volk, Rebekka & Schultmann, Frank, 2022. "On the integration of diverging material flows into resource‐constrained project scheduling," European Journal of Operational Research, Elsevier, vol. 303(3), pages 1071-1087.
    11. Siqian Shen & J. Cole Smith & Shabbir Ahmed, 2010. "Expectation and Chance-Constrained Models and Algorithms for Insuring Critical Paths," Management Science, INFORMS, vol. 56(10), pages 1794-1814, October.
    12. Alvarez-Valdes, R. & Crespo, E. & Tamarit, J.M. & Villa, F., 2008. "GRASP and path relinking for project scheduling under partially renewable resources," European Journal of Operational Research, Elsevier, vol. 189(3), pages 1153-1170, September.
    13. Huynh Tuong, Nguyen & Soukhal, Ameur, 2010. "Due dates assignment and JIT scheduling with equal-size jobs," European Journal of Operational Research, Elsevier, vol. 205(2), pages 280-289, September.
    14. Dorit S. Hochbaum & Anna Chen, 2000. "Performance Analysis and Best Implementations of Old and New Algorithms for the Open-Pit Mining Problem," Operations Research, INFORMS, vol. 48(6), pages 894-914, December.
    15. Xianzhao Zhang & Dachuan Xu & Donglei Du & Chenchen Wu, 2018. "Approximation algorithms for precedence-constrained identical machine scheduling with rejection," Journal of Combinatorial Optimization, Springer, vol. 35(1), pages 318-330, January.
    16. Perrone, G. & Roma, P. & Lo Nigro, G., 2010. "Designing multi-attribute auctions for engineering services procurement in new product development in the automotive context," International Journal of Production Economics, Elsevier, vol. 124(1), pages 20-31, March.
    17. Kaiyue Zheng & Laura A. Albert, 2019. "Interdiction models for delaying adversarial attacks against critical information technology infrastructure," Naval Research Logistics (NRL), John Wiley & Sons, vol. 66(5), pages 411-429, August.
    18. Mukesh Kumar Mehlawat & Nishtha Grover, 2018. "Intuitionistic fuzzy multi-criteria group decision making with an application to critical path selection," Annals of Operations Research, Springer, vol. 269(1), pages 505-520, October.
    19. Jungen, F. J. & Kowalczyk, W., 1995. "An intelligent interactive project management support system," European Journal of Operational Research, Elsevier, vol. 84(1), pages 60-81, July.
    20. Sayyid Ali Banihashemi & Mohammad Khalilzadeh & Edmundas Kazimieras Zavadskas & Jurgita Antucheviciene, 2021. "Investigating the Environmental Impacts of Construction Projects in Time-Cost Trade-Off Project Scheduling Problems with CoCoSo Multi-Criteria Decision-Making Method," Sustainability, MDPI, vol. 13(19), pages 1-17, September.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:navres:v:38:y:1991:i:3:p:413-430. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)1520-6750 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.