Author
Abstract
This paper presents an extension of gold‐mining problems formulated in earlier work by R. Bellman and J. Kadane. Bellman assumes there are two gold mines labeled A and B, respectively, each with a known initial amount of gold. There is one delicate gold‐mining machine which can be used to excavate one mine per day. Associated with mine A is a known constant return rate and a known constant probability of breakdown. There is also a return rate and probability of breakdown for mine B. Bellman solves the problem of finding a sequential decision procedure to maximize the expected amount of gold obtained before breakdown of the machine. Kadane extends the problem by assuming that there are several mines and that there are sequences of constants such that the jth constant for each mine represents the return rate for the jth excavation of that mine. He also assumes that the probability of breakdown during the jth excavation of a mine depends on j. We extend these results by assuming that the return rates are random variables with known joint distribution and by allowing the probability of breakdown to be a function of previous observations on the return rates. We show that under certain regularity conditions on the joint distributions of the random variables, the optimal policy is: at each stage always select a mine which has maximal conditional expected return per unit risk. This gold‐mining problem is also a formulation of the problem of time‐sequential tactical allocation of bombers to targets. Several examples illustrating these results are presented.
Suggested Citation
Gaineford J. Hall, 1978.
"Nonstationary stochastic gold‐mining: A time‐sequential tactical‐allocation problem,"
Naval Research Logistics Quarterly, John Wiley & Sons, vol. 25(1), pages 81-93, March.
Handle:
RePEc:wly:navlog:v:25:y:1978:i:1:p:81-93
DOI: 10.1002/nav.3800250107
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:wly:navlog:v:25:y:1978:i:1:p:81-93. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Wiley Content Delivery (email available below). General contact details of provider: https://doi.org/10.1002/(ISSN)1931-9193 .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.