Author
Listed:
- Radujković Mladen
(Croatian Association for Project Management, Croatia; Alma Mater Europea ECM, Slovenska ulica 17, Maribor 2000, Slovenia.)
- Klepo Mariela Sjekavica
(Hrvatske vode, Zagreb, Croatia)
Abstract
There is no doubt that each project manager uses different methodologies, methods, tools and techniques (MMTTs) while dealing with constant pressure to deliver results in a complex and changing environment, where complexity and stakeholders’ expectations are continually growing. This article presents results from the study about project managers’ choice on artefacts that they frequently use in their regular work. This study was conducted within the context of selected environment (one country and one sector of engineering projects), but designed methodology and results might also be significant for a wider audience. The results were based on the feedback that were received from 31 project management (PM) professionals gathered in the form of a structured questionnaire, followed by an interview with three PM experts for validation. The results confirmed a variety of PM artefacts in use and provided their ranking by perceived usefulness. The additional results indicated correlation between PM success and usage of MMTTs, as perceived by project managers. This study also resulted in several interesting findings, such as popularity and usefulness of artefacts, rigidity of PM processes, and maturity of PM organizations, about the topic. Despite of rather small sample taken from one country's environment, the results could serve as a solid information for moving ahead, while considering the significance of PM artefacts, as well as for their further development. The key findings are also messages to PM professionals to consider whether they use available and appropriate PM artefacts and is there a room for more efficient and effective usage.
Suggested Citation
Radujković Mladen & Klepo Mariela Sjekavica, 2021.
"A study of project managers’ choice on key methods, tools and techniques in managing engineering projects,"
Organization, Technology and Management in Construction, Sciendo, vol. 13(1), pages 2327-2340, January.
Handle:
RePEc:vrs:otamic:v:13:y:2021:i:1:p:2327-2340:n:3
DOI: 10.2478/otmcj-2021-0002
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:vrs:otamic:v:13:y:2021:i:1:p:2327-2340:n:3. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Peter Golla (email available below). General contact details of provider: https://www.sciendo.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.