Abstract
The authors aim to provide a set of tools to facilitate the main stages of the competitive bidding process for construction contractors. These involve 1) deciding whether to bid, 2) calculating the total price, and 3) breaking down the total price into the items of the bill of quantities or the schedule of payments to optimise contractor cash flows. To define factors that affect the decision to bid, the authors rely upon literature on the subject and put forward that multi-criteria methods are applied to calculate a single measure of contract attractiveness (utility value). An attractive contract implies that the contractor is likely to offer a lower price to increase chances of winning the competition. The total bid price is thus to be interpolated between the lowest acceptable and the highest justifiable price based on the contract attractiveness. With the total bid price established, the next step is to split it between the items of the schedule of payments. A linear programming model is proposed for this purpose. The application of the models is illustrated with a numerical example.The model produces an economically justified bid price together with its breakdown, maintaining the logical proportion between unit prices of particular items of the schedule of payment. Contrary to most methods presented in the literature, the method does not focus on the trade-off between probability of winning and the price but is solely devoted to defining the most reasonable price under project-specific circumstances.The approach proposed in the paper promotes a systematic approach to real-life bidding problems. It integrates practices observed in operation of construction enterprises and uses directly available input. It may facilitate establishing the contractor’s in-house procedures and managerial decision support systems for the pricing process.
Suggested Citation
Biruk Sławomir & Jaśkowski Piotr & Czarnigowska Agata, 2017.
"Modelling contractor’s bidding decision,"
Engineering Management in Production and Services, Sciendo, vol. 9(1), pages 64-73, March.
Handle:
RePEc:vrs:ecoman:v:9:y:2017:i:1:p:64-73:n:7
DOI: 10.1515/emj-2017-0007
Download full text from publisher
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:vrs:ecoman:v:9:y:2017:i:1:p:64-73:n:7. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Peter Golla (email available below). General contact details of provider: https://www.sciendo.com .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.