IDEAS home Printed from https://ideas.repec.org/a/vrs/ecoman/v10y2018i2p15-28n2.html
   My bibliography  Save this article

Challenges of BIM technology application in project planning

Author

Listed:
  • Ustinovičius Leonas

    (Vilnius Gediminas Technical University, Faculty of Civil Engineering, Lithuania)

  • Puzinas Arūnas

    (Vilnius Gediminas Technical University, Faculty of Civil Engineering, Lithuania)

  • Starynina Jovita

    (Vilnius Gediminas Technical University, Faculty of Civil Engineering, Lithuania)

  • Vaišnoras Mantas

    (Vilnius Gediminas Technical University, Faculty of Civil Engineering, Lithuania)

  • Černiavskaja Oksana

    (Vilnius Gediminas Technical University, Faculty of Civil Engineering, Lithuania)

  • Kontrimovičius Robertas

    (Vilnius Gediminas Technical University, Faculty of Civil Engineering, Lithuania)

Abstract

The study aimes at identification of the difficulties in choosing the correct concept of the main building process. The use of a proper BIM design may help the user avoid mistakes and make the building process faster as well as less financial resource intensive. The authors focused on literature review, analysing the difficulties of the BIM design software technology in construction project planning. The biggest flaws in BIM design are inherent in three building process stages: 1) the preparation of a building investment project, and the analysis of the existing situation; 2) the preparation of the building execution technology project; 3) the existing standard processing and information collection in building exploitation period. The analysis shows a persistent need for a deeper BIM design research, to improve information interchange formats that would ensure as much design information saved as possible with ensured feedback. As well as in BIM design, the software packages must be improved by supplementing them with deficient tools or programme codes. After the research of BIM design software, it was determined that architectural, constructional and MEP programs work best interdependently and get analysed the most. These programs work best as they make the least number of mistakes when the model is created in one setting and has many tools. This type of design software data is kept internally, and they are converted into IFC or other information interchange format. Without changing the format, the data is not lost, and this is the reason behind fluent information interchange.

Suggested Citation

  • Ustinovičius Leonas & Puzinas Arūnas & Starynina Jovita & Vaišnoras Mantas & Černiavskaja Oksana & Kontrimovičius Robertas, 2018. "Challenges of BIM technology application in project planning," Engineering Management in Production and Services, Sciendo, vol. 10(2), pages 15-28, June.
  • Handle: RePEc:vrs:ecoman:v:10:y:2018:i:2:p:15-28:n:2
    DOI: 10.2478/emj-2018-0008
    as

    Download full text from publisher

    File URL: https://doi.org/10.2478/emj-2018-0008
    Download Restriction: no

    File URL: https://libkey.io/10.2478/emj-2018-0008?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:vrs:ecoman:v:10:y:2018:i:2:p:15-28:n:2. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Peter Golla (email available below). General contact details of provider: https://www.sciendo.com .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.