IDEAS home Printed from https://ideas.repec.org/a/taf/uteexx/v64y2019i1p1-23.html
   My bibliography  Save this article

Parallel machine replacement under horizon uncertainty

Author

Listed:
  • Javad Seif
  • Brett A. Shields
  • Andrew Junfang Yu

Abstract

Construction projects usually get delayed for several time periods. When the planning horizon of a project is extended, projections for purchase and salvage of machinery within the planning horizon become inaccurate and less beneficial and often lead to unexpected costs. In this article, we formulate a parallel machine replacement (PMR) problem as a two-stage stochastic program with an uncertain planning horizon. We consider renting as an alternative to purchasing and maintaining the machinery. We show the application of the model through a case study in construction projects. Through numerical analysis, we derive managerial implications and show the value of the stochastic model.

Suggested Citation

  • Javad Seif & Brett A. Shields & Andrew Junfang Yu, 2019. "Parallel machine replacement under horizon uncertainty," The Engineering Economist, Taylor & Francis Journals, vol. 64(1), pages 1-23, January.
  • Handle: RePEc:taf:uteexx:v:64:y:2019:i:1:p:1-23
    DOI: 10.1080/0013791X.2018.1535012
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/0013791X.2018.1535012
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/0013791X.2018.1535012?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Zhang, Le & Gu, Weihua & Fu, Liangliang & Mei, Yu & Hu, Yaohua, 2021. "A two-stage heuristic approach for fleet management optimization under time-varying demand," Transportation Research Part E: Logistics and Transportation Review, Elsevier, vol. 147(C).

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:uteexx:v:64:y:2019:i:1:p:1-23. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/UTEE20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.