IDEAS home Printed from https://ideas.repec.org/a/taf/uteexx/v62y2017i2p161-179.html
   My bibliography  Save this article

Time-driven activity-based costing for health care provider supply chains

Author

Listed:
  • Martha Gonzalez
  • Heather Nachtmann
  • Edward Pohl

Abstract

Health care providers currently operate in an environment of complex supply chains and increasing costs where approximately one third of hospital operating expenses are related to supplies. It is pertinent that health care providers have a clear understanding of their supply chain process costs. Knowing how these costs are driven and where opportunities for cost reduction exist can support health care provider supply chain (HPSC) efficiency. In this article, we present a time-driven activity-based costing (TDABC) supply chain cost methodology for health care providers. A TDABC management system can provide health care providers with valuable product and process supply chain cost information by investigating logistics activities, resource consumption, and time drivers. Our HPSC TDABC methodology is demonstrated in a case study conducted for the supply chain department of a 200-bed, not-for-profit hospital.

Suggested Citation

  • Martha Gonzalez & Heather Nachtmann & Edward Pohl, 2017. "Time-driven activity-based costing for health care provider supply chains," The Engineering Economist, Taylor & Francis Journals, vol. 62(2), pages 161-179, April.
  • Handle: RePEc:taf:uteexx:v:62:y:2017:i:2:p:161-179
    DOI: 10.1080/0013791X.2016.1264035
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/0013791X.2016.1264035
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/0013791X.2016.1264035?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Victor Jiménez & Paulo Afonso & Gabriela Fernandes, 2020. "Using Agile Project Management in the Design and Implementation of Activity-Based Costing Systems," Sustainability, MDPI, vol. 12(24), pages 1-23, December.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:uteexx:v:62:y:2017:i:2:p:161-179. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/UTEE20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.