Author
Listed:
- Kefei Liu
- Zhibin Jiang
- Liping Zhou
Abstract
Motivated by make-to-order applications with committed delivery dates in a variety of industries, we investigate the integrated multi-plant collaborative production, inventory, and hub–spoke delivery problem in a complex production–distribution network. This network includes multi-location heterogeneous plants, distribution centers, and customers, for producing customized and splittable orders with one or more general-size multi-type jobs. Completed jobs are transported from plants to distribution centers, and then the orders whose all constituent jobs have arrived are delivered from distribution centers to customer sites. The objective is to make integrated scheduling decisions for production, inventory, and delivery, for minimizing total cost composed of production, transportation, tardiness, and inventory. We first formulate this problem as a mixed-integer programming model, and analyze its intractability by proving that the problem is NP-hard and no approximation algorithms exist with a constant worst-case ratio. We then reformulate this problem as a binary integer linear programming model to select a feasible schedule for each job, and propose a combined column generation and two-layer column enumeration algorithm to solve it. Through extensive numerical experiments, we demonstrate that our proposed algorithm is capable of generating optimal or near-optimal solutions expeditiously and outperforms four benchmark approaches, and gain valuable managerial insights for practitioners.
Suggested Citation
Kefei Liu & Zhibin Jiang & Liping Zhou, 2025.
"Integrated multi-plant collaborative production, inventory, and hub–spoke delivery of make-to-order products,"
IISE Transactions, Taylor & Francis Journals, vol. 57(1), pages 60-74, January.
Handle:
RePEc:taf:uiiexx:v:57:y:2025:i:1:p:60-74
DOI: 10.1080/24725854.2023.2272261
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:uiiexx:v:57:y:2025:i:1:p:60-74. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/uiie .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.