IDEAS home Printed from https://ideas.repec.org/a/taf/transr/v35y2015i2p162-182.html
   My bibliography  Save this article

Risk Management in Motorway PPP Projects: Empirical-based Guidelines

Author

Listed:
  • N. Carbonara
  • N. Costantino
  • L. Gunnigan
  • R. Pellegrino

Abstract

This paper deals with the topic of risk management in Public Private Partnership (PPP). The analysis of the related literature reveals that risks must be analyzed and managed on a context-specific approach, and that there is a lack of a comprehensive study on the appropriate risk mitigation strategies for each risk embedded in PPP projects. Focusing on the transport sector, based on the results of a Delphi survey, the paper provides guidelines for both public and private parties in defining a list of significant risks in PPP motorway projects, and identifying for them both the effective allocation and the suitable mitigation strategies. Results of the Delphi survey have been compared with the common practices on risk management applied in eight real motorway PPP projects.

Suggested Citation

  • N. Carbonara & N. Costantino & L. Gunnigan & R. Pellegrino, 2015. "Risk Management in Motorway PPP Projects: Empirical-based Guidelines," Transport Reviews, Taylor & Francis Journals, vol. 35(2), pages 162-182, March.
  • Handle: RePEc:taf:transr:v:35:y:2015:i:2:p:162-182
    DOI: 10.1080/01441647.2015.1012696
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/01441647.2015.1012696
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01441647.2015.1012696?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Crispim, José & Fernandes, Jorge & Rego, Nazaré, 2020. "Customized risk assessment in military shipbuilding," Reliability Engineering and System Safety, Elsevier, vol. 197(C).
    2. Marzouk, Mohamed & Ali, Mohamed, 2018. "Mitigating risks in wastewater treatment plant PPPs using minimum revenue guarantee and real options," Utilities Policy, Elsevier, vol. 53(C), pages 121-133.
    3. Robert Rybnicek & Roland Königsgruber, 2019. "What makes industry–university collaboration succeed? A systematic review of the literature," Journal of Business Economics, Springer, vol. 89(2), pages 221-250, March.
    4. Matos, José M.A. & Ramos, Sandra & Costa, Vítor, 2019. "Stochastic simulated rents in Portuguese public-private partnerships," Transportation Research Part A: Policy and Practice, Elsevier, vol. 130(C), pages 107-117.
    5. Yin Chen & Mei Ye Kho & Othman Mohamed, 2024. "Developing a Conceptual Model for Promoting Risk Management for Public–Private Partnerships Projects," Sustainability, MDPI, vol. 16(18), pages 1-22, September.
    6. Dejan Makovšek & Marian Moszoro, 2018. "Risk pricing inefficiency in public–private partnerships," Transport Reviews, Taylor & Francis Journals, vol. 38(3), pages 298-321, May.
    7. Binchao Deng & Dongjie Zhou & Jiachen Zhao & Yilin Yin & Xiaoyu Li, 2021. "Fuzzy Synthetic Evaluation of the Critical Success Factors for the Sustainability of Public Private Partnership Projects in China," Sustainability, MDPI, vol. 13(5), pages 1-23, February.
    8. Shrestha, Asheem & Chan, Toong-Khuan & Aibinu, Ajibade A. & Chen, Chuan, 2017. "Efficient risk transfer in PPP wastewater treatment projects," Utilities Policy, Elsevier, vol. 48(C), pages 132-140.
    9. Mochon, Pablo & Mochon, Asuncion & Saez, Yago, 2022. "Combinatorial versus sequential auctions to allocate PPP highway projects," Transport Policy, Elsevier, vol. 117(C), pages 23-39.
    10. Yorela Yenifer Esperilla-Niño-de-Guzmán & María de los Ángeles Baeza-Muñoz & Francisco Jesús Gálvez-Sánchez & Valentín Molina-Moreno, 2024. "Public–Private Partnership (PPP) in Road Infrastructure Projects: A Review of Evolution, Approaches, and Prospects," Sustainability, MDPI, vol. 16(4), pages 1-24, February.
    11. Babatunde, Solomon Olusola & Perera, Srinath, 2017. "Analysis of traffic revenue risk factors in BOT road projects in developing countries," Transport Policy, Elsevier, vol. 56(C), pages 41-49.
    12. Mulungu, Kelvin & Kilimani, Nicholas, 2023. "Does forest access reduce reliance on costly shock-coping strategies? Evidence from Malawi," Ecological Economics, Elsevier, vol. 209(C).
    13. Zhao, Jianfeng & Liu, Henry J. & Love, Peter E.D. & Greenwood, David J. & Sing, Michael C.P., 2022. "Public-private partnerships: A dynamic discrete choice model for road projects," Socio-Economic Planning Sciences, Elsevier, vol. 82(PA).
    14. Kangsoo Kim & Jinoh Kim & Donghyung Yook, 2021. "Analysis of Features Affecting Contracted Rate of Return of Korean PPP Projects," Sustainability, MDPI, vol. 13(6), pages 1-21, March.
    15. Love, Peter E.D. & Ika, Lavagnon & Matthews, Jane & Fang, Weili, 2021. "Shared leadership, value and risks in large scale transport projects: Re-calibrating procurement policy for post COVID-19," Research in Transportation Economics, Elsevier, vol. 90(C).

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:transr:v:35:y:2015:i:2:p:162-182. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TTRV20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.