Abstract

This paper reviews the literature on factors which help to realise major transport infrastructure projects within the forecasted budget, schedule and with the expected output. The most mentioned factors overall are as follows: (1) improving the cost and benefit estimates of projects, (2) containing the risks involved in these projects, (3) increasing accountability and (4) maintaining clear scope and objectives. Statistical research, in particular, focuses on these particular factors, but different research methodologies produce different results. Research based on case studies and interviews does not discuss accountability at all, while literature reviews and discussions show a remarkable focus on this specific factor. Furthermore, there is variety in the factors mentioned in papers investigating cost overruns, schedule overruns or output shortfalls. Overall, the research in this field focuses on failure within major transport infrastructure projects. These results show that a framework for building major transport infrastructure projects within budget, in time and with the expected output is emerging, but that more research is needed using multivariate analyses. Also, more research focusing on projects which have actually achieved their forecasts is needed.

Suggested Citation

  • M. De Jong & J. A. Annema & G. P. Van Wee, 2013. "How to Build Major Transport Infrastructure Projects within Budget, in Time and with the Expected Output; a Literature Review," Transport Reviews, Taylor & Francis Journals, vol. 33(2), pages 195-218, March.
  • Handle: RePEc:taf:transr:v:33:y:2013:i:2:p:195-218
    DOI: 10.1080/01441647.2013.778912
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/01441647.2013.778912
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01441647.2013.778912?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Bartlomiej Rokicki & Krzysztof Ostaszewski, 2022. "Actuarial Credibility Approach in Adjusting Initial Cost Estimates of Transport Infrastructure Projects," Sustainability, MDPI, vol. 14(20), pages 1-12, October.
    2. Miranda Sarmento, J.J. & Renneboog, Luc, 2017. "Cost overruns in public sector investment projects," Other publications TiSEM 51799a3e-4c78-4dbd-b330-b, Tilburg University, School of Economics and Management.
    3. Brookes, Naomi J. & Locatelli, Giorgio, 2015. "Power plants as megaprojects: Using empirics to shape policy, planning, and construction management," Utilities Policy, Elsevier, vol. 36(C), pages 57-66.
    4. Francisco Pinheiro Catalão & Carlos Oliveira Cruz & Joaquim Miranda Sarmento, 2023. "The entanglement of time and cost deviations in public projects," Annals of Public and Cooperative Economics, Wiley Blackwell, vol. 94(1), pages 241-272, March.
    5. Miranda Sarmento, J.J., 2014. "Public private partnerships," Other publications TiSEM c7d4c978-234c-4f88-83ed-1, Tilburg University, School of Economics and Management.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:transr:v:33:y:2013:i:2:p:195-218. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TTRV20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.