Author
Listed:
- Hamed Kazemi
- Mustapha Nourelfath
- Amir M. Fathollahi-Fard
- Michel Gendreau
Abstract
In the dynamic landscape of contemporary industry, integrating maintenance practices with production scheduling is essential for sustaining operational efficiency and competitiveness. This study addresses a two-stage multi-factory assembly scheduling problem, introducing an innovative approach that incorporates maintenance practices to enhance system reliability in the face of unexpected machine failures. For deterministic scheduling, a tailored mixed-integer programming model is presented to minimise the makespan. This model is extended to formulate a stochastic schedule, accommodating unforeseen machine breakdowns through stochastic distributions. The extension includes the integration of preventive and corrective maintenance activities into an integrated two-stage multi-factory assembly scheduling problem. To solve the resulting optimisation problem, a decomposition algorithm utilising an exact solver is proposed. This approach breaks down the main model into smaller models, addressing computational challenges. Comparative analyses against the widely adopted CPLEX software across various instances validate the effectiveness of our approach. A significant finding from this comparison is that our decomposition algorithm outperforms the exact solver, achieving the optimal solution at a faster rate. In sensitivity analyses, the results underscore the superior solution-finding capability of our integrated stochastic model compared to maintenance heuristics from existing literature.
Suggested Citation
Hamed Kazemi & Mustapha Nourelfath & Amir M. Fathollahi-Fard & Michel Gendreau, 2025.
"Integrated two-stage multi-factory assembly scheduling with maintenance considerations,"
International Journal of Production Research, Taylor & Francis Journals, vol. 63(6), pages 2133-2149, March.
Handle:
RePEc:taf:tprsxx:v:63:y:2025:i:6:p:2133-2149
DOI: 10.1080/00207543.2024.2396512
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:tprsxx:v:63:y:2025:i:6:p:2133-2149. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TPRS20 .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.