Author
Listed:
- Ruoyu Liao
- Yihai He
- Min Xie
- Haibin Cao
- Hanjun Guo
- Haiyun Lu
- Wei Dai
Abstract
The fluctuation of various parameters in the production process increases the risk of generating unqualified products and suffering from systematic failures and downtimes, and the preventive maintenance and control of potentially faulty machines in manufacturing systems should consider the continuous increase of operational risk. Therefore, to proactive control the manufacturing system operational risk, a joint model of risk-based maintenance (RBM) and integrated monitoring is proposed. The proposed model formulates an appropriate maintenance strategy and appropriate control charts for monitoring the manufacturing process, guaranteeing the stable operation of the manufacturing system. First, considering the co-effect of the production equipment state and workpiece quality, a novel connotation of the manufacturing system mechanism’s operational risk is proposed, and the RBM framework is constructed. Second, considering the manufacturing system operational state, an integrated maintenance decision-making model based on different risk scenarios is established using a dynamic monitoring scheme based on EWMA control charts. Third, a particle swarm optimisation algorithm is adopted to optimise the proposed model to obtain the optimal maintenance strategy for production equipment and monitoring parameter for workpiece quality. Finally, the effectiveness of the proposed approach is illustrated with a case study on a subway current receiver production line.
Suggested Citation
Ruoyu Liao & Yihai He & Min Xie & Haibin Cao & Hanjun Guo & Haiyun Lu & Wei Dai, 2025.
"Joint risk-based maintenance strategy and integrated monitoring approach for manufacturing system operational process considering workpiece quality,"
International Journal of Production Research, Taylor & Francis Journals, vol. 63(4), pages 1354-1371, February.
Handle:
RePEc:taf:tprsxx:v:63:y:2025:i:4:p:1354-1371
DOI: 10.1080/00207543.2024.2374848
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:tprsxx:v:63:y:2025:i:4:p:1354-1371. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TPRS20 .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.