Abstract
Estimates of production systems performance metrics, such as machine efficiency, e, system throughput, TP, lead time, LT, and work-in-process, WIP, are necessary for evaluating effectiveness of potential system modifications. Calculating these estimates requires machines MTBF and MTTR, which can be obtained by measuring up- and downtime realizations on the factory floor. A question arises: What is the smallest number of measurements required to ensure the desired accuracy of the induced estimates ${\hat {e}} $eˆ, ( ${\widehat {TP}} $TPˆ), ( ${\widehat {LT}} $LTˆ) and ( ${\widehat {WIP}} $WIPˆ)? This paper provides an answer to this question in terms of serial lines with exponential machines. The approach is based on the theory of ( $\alpha, \beta $α,β)-precise estimates ( ${\widehat {MTBF}} $MTBFˆ) and ( ${\widehat {MTTR}} $MTTRˆ), where $\alpha $α represents estimate's accuracy and $\beta $β its probability. Specifically, the paper calculates ( $\alpha_X,\beta_X $αX,βX)-precise estimates of $X\in\{e,TP,LT,WIP\} $X∈{e,TP,LT,WIP} induced by ( ${\widehat {MTBF}} $MTBFˆ) and ( ${\widehat {MTTR}} $MTTRˆ), and evaluates the smallest number of machines' up- and downtime measurements, which ensure the desired precision of $\hat{X} \in \{\hat{e},\widehat{TP},\widehat{LT},\widehat{WIP}\} $Xˆ∈{eˆ,TPˆ,LTˆ,WIPˆ}. In addition, the paper develops a method for evaluating the smallest number of parts quality measurements to ensure ( $\alpha_q,\beta_q $αq,βq)-precise estimate of machines' quality parameter q and the desired ( $\alpha_{TP_q},\beta_{TP_q} $αTPq,βTPq)-precise estimate of good parts throughput, $\widehat{TP}_q $TPˆq. The results obtained are intended for production systems managerial/engineering/research personnel as a tool for designing continuous improvement projects with analytically predicted outcomes.
Suggested Citation
Pooya Alavian & Yongsoon Eun & Kang Liu & Semyon M. Meerkov & Liang Zhang, 2022.
"The (αX, βX)-precise estimates of production systems performance metrics,"
International Journal of Production Research, Taylor & Francis Journals, vol. 60(7), pages 2230-2253, April.
Handle:
RePEc:taf:tprsxx:v:60:y:2022:i:7:p:2230-2253
DOI: 10.1080/00207543.2021.1886367
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:tprsxx:v:60:y:2022:i:7:p:2230-2253. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TPRS20 .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.