IDEAS home Printed from https://ideas.repec.org/a/taf/tprsxx/v59y2021i15p4670-4689.html
   My bibliography  Save this article

Variable takt times in mixed-model assembly line balancing with random customisation

Author

Listed:
  • Tobias Mönch
  • Arnd Huchzermeier
  • Peter Bebersdorf

Abstract

In turbulent times featuring increased customisation, higher demand volatility, and shortened product life cycles, companies gain a competitive advantage by adopting a single yet highly flexible assembly line. A cornerstone of today's production systems is determining the optimal takt time (or cycle time) by aligning the assembly pace with the desired level of output. In practice, most companies rely on a fixed takt time, even when the work content between models varies considerably. We show that, in contrast to a fixed takt system, variable takt times reduce not only labour inefficiencies but also the complexity of the mixed-model assembly line balancing problem. Inspired by our industry partner Fendt, an innovation leader in the global agricultural machinery market and benchmark for a wide range of industries, we define a generalisable mixed-integer programming model that accounts for key conditions neglected in previous research – in particular, random customisation through configuration-specific task times and assembly quality by assigning operator workloads to ‘zones’. Introducing such operator work zones reveals that firms need not face a time–quality trade-off whereby takt time must be prioritised over how well work is performed. Our numerical study and takt time sensitivity analysis document the effectiveness of this approach when its results are compared with those under Fendt's current takt times.

Suggested Citation

  • Tobias Mönch & Arnd Huchzermeier & Peter Bebersdorf, 2021. "Variable takt times in mixed-model assembly line balancing with random customisation," International Journal of Production Research, Taylor & Francis Journals, vol. 59(15), pages 4670-4689, August.
  • Handle: RePEc:taf:tprsxx:v:59:y:2021:i:15:p:4670-4689
    DOI: 10.1080/00207543.2020.1769874
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/00207543.2020.1769874
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/00207543.2020.1769874?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Arnd Huchzermeier & Tobias Mönch, 2023. "Mixed‐model assembly lines with variable takt and open stations," Production and Operations Management, Production and Operations Management Society, vol. 32(3), pages 704-722, March.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:tprsxx:v:59:y:2021:i:15:p:4670-4689. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TPRS20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.