IDEAS home Printed from https://ideas.repec.org/a/taf/tprsxx/v57y2019i8p2548-2570.html
   My bibliography  Save this article

Integrated production, statistical process control, and maintenance policy for unreliable manufacturing systems

Author

Listed:
  • Nadia Bahria
  • Anis Chelbi
  • Hanen Bouchriha
  • Imen Harbaoui Dridi

Abstract

The objective of this paper is to develop an integrated approach for the joint control of production, maintenance and quality for batch manufacturing systems. We consider such systems that are subject to degradation which is at the origin of the production of defective units. The quality control of lots produced is performed using an ‘x-bar’ control chart. This graphical tool will allow estimating the quality of the batch being produced and possibly undertake perfect preventive or corrective maintenance actions on the production system. A buffer stock is built to maintain continuity of supply during maintenance actions. The incurred total cost includes setup cost, inventory costs, the cost of unused products, maintenance costs and quality costs. Decision variables include the buffer stock size, the sample size, the sampling interval, the surveillance and the control limits of the control chart. Numerical experiments and sensitivity analyses are provided to evaluate the effectiveness of the proposed control policy and the robustness of the solving approach.

Suggested Citation

  • Nadia Bahria & Anis Chelbi & Hanen Bouchriha & Imen Harbaoui Dridi, 2019. "Integrated production, statistical process control, and maintenance policy for unreliable manufacturing systems," International Journal of Production Research, Taylor & Francis Journals, vol. 57(8), pages 2548-2570, April.
  • Handle: RePEc:taf:tprsxx:v:57:y:2019:i:8:p:2548-2570
    DOI: 10.1080/00207543.2018.1530472
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/00207543.2018.1530472
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/00207543.2018.1530472?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Tambe, Pravin P. & Kulkarni, Makarand S., 2022. "A reliability based integrated model of maintenance planning with quality control and production decision for improving operational performance," Reliability Engineering and System Safety, Elsevier, vol. 226(C).
    2. Azimpoor, Samareh & Taghipour, Sharareh, 2021. "Joint inspection and product quality optimization for a system with delayed failure," Reliability Engineering and System Safety, Elsevier, vol. 215(C).
    3. Cheng, Guoqing & Li, Ling, 2020. "Joint optimization of production, quality control and maintenance for serial-parallel multistage production systems," Reliability Engineering and System Safety, Elsevier, vol. 204(C).

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:tprsxx:v:57:y:2019:i:8:p:2548-2570. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TPRS20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.