IDEAS home Printed from https://ideas.repec.org/a/taf/tprsxx/v57y2019i21p6634-6647.html
   My bibliography  Save this article

A two-stage three-machine assembly scheduling problem with deterioration effect

Author

Listed:
  • Chin-Chia Wu
  • Ameni Azzouz
  • I-Hong Chung
  • Win-Chin Lin
  • Lamjed Ben Said

Abstract

The two-stage assembly scheduling problem has received growing attention in the research community. Furthermore, in many two-stage assembly scheduling problems, the job processing times are commonly assumed as a constant over time. However, it is at odds with real production situations some times. In fact, the dynamic nature of processing time may occur when machines lose their performance during their execution times. In this case, the job that is processed later consumes more time than another one processed earlier. In view of these observations, we address the two-stage assembly linear deterioration scheduling problem in which there are two machines at the first stage and an assembly machine at the second stage. The objective is to complete all jobs as soon as possible (or to minimise the makespan, implies that the system can yield a better and efficient task planning to limited resources). Given the fact that this problem is NP-hard, we then derive some dominance relations and a lower bound used in the branch-and-bound method for finding the optimal solution. We also propose three metaheuristics, including dynamic differential evolution (DDE), simulated annealing (SA) algorithm, and cloud theory-based simulated annealing (CSA) algorithm for find near-optimal solutions. The performances of the proposed algorithms are reported as well.

Suggested Citation

  • Chin-Chia Wu & Ameni Azzouz & I-Hong Chung & Win-Chin Lin & Lamjed Ben Said, 2019. "A two-stage three-machine assembly scheduling problem with deterioration effect," International Journal of Production Research, Taylor & Francis Journals, vol. 57(21), pages 6634-6647, November.
  • Handle: RePEc:taf:tprsxx:v:57:y:2019:i:21:p:6634-6647
    DOI: 10.1080/00207543.2019.1570378
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/00207543.2019.1570378
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/00207543.2019.1570378?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Xiao Wang & Mei Liu & Peisi Zhong & Chao Zhang & Dawei Zhang, 2023. "A Discrete Cooperative Control Method for Production Scheduling Problem of Assembly Manufacturing System," Sustainability, MDPI, vol. 15(18), pages 1-23, September.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:tprsxx:v:57:y:2019:i:21:p:6634-6647. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TPRS20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.