IDEAS home Printed from https://ideas.repec.org/a/taf/tprsxx/v57y2019i19p5951-5973.html
   My bibliography  Save this article

A trade-off between productivity and cost for the integrated part quality inspection and preventive maintenance planning under uncertainty

Author

Listed:
  • Mohammad Rezaei-Malek
  • Ali Siadat
  • Jean-Yves Dantan
  • Reza Tavakkoli-Moghaddam

Abstract

This paper proposes a robust possibilistic and multi-objective mixed-integer linear programming mathematical model to concurrently plan part quality inspection and Preventive Maintenance (PM) activities for a serial multi-stage production system. This system contains the deteriorating stages and faces the uncertainty about estimated cost components and demand amount. The integrated model reaches two significant decisions which are the right time and place for performing the part quality inspection and PM. These decisions are made while the model is to simultaneously optimise the implied system productivity and total cost. To measure the implied system productivity, a new piecewise utility function for the ratio of produced conforming products to input workpieces is developed. A real case study and a numerical example are explored to validate and verify the developed model. The results prove the significance and effectiveness of considering the uncertainty and conflicting practical objectives for the problem.

Suggested Citation

  • Mohammad Rezaei-Malek & Ali Siadat & Jean-Yves Dantan & Reza Tavakkoli-Moghaddam, 2019. "A trade-off between productivity and cost for the integrated part quality inspection and preventive maintenance planning under uncertainty," International Journal of Production Research, Taylor & Francis Journals, vol. 57(19), pages 5951-5973, October.
  • Handle: RePEc:taf:tprsxx:v:57:y:2019:i:19:p:5951-5973
    DOI: 10.1080/00207543.2018.1556411
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/00207543.2018.1556411
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/00207543.2018.1556411?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Amir Homayoun Sarfaraz & Amir Karbassi Yazdi & Thomas Hanne & Peter Fernandes Wanke & Raheleh Sadat Hosseini, 2023. "Assessing repair and maintenance efficiency for water suppliers: a novel hybrid USBM-FIS framework," Operations Management Research, Springer, vol. 16(3), pages 1321-1342, September.
    2. Kafiabad, Shayan Tavakoli & Kazemi Zanjani, Masoumeh & Nourelfath, Mustapha, 2020. "Integrated planning of operations and on-job training in maintenance logistics networks," Reliability Engineering and System Safety, Elsevier, vol. 199(C).

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:tprsxx:v:57:y:2019:i:19:p:5951-5973. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TPRS20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.