IDEAS home Printed from https://ideas.repec.org/a/taf/tprsxx/v57y2019i11p3478-3503.html
   My bibliography  Save this article

Integrated berth allocation and quay crane assignment with maintenance activities

Author

Listed:
  • Feifeng Zheng
  • Ying Li
  • Feng Chu
  • Ming Liu
  • Yinfeng Xu

Abstract

With the rapid development of worldwide container trade, quay cranes and other resources in container terminals are suffering from increasing workloads. To reduce their failure probabilities, quay cranes usually require preventive maintenance. However, these important activities are often ignored during quay crane planning in literature. This work studies an integrated berth allocation, quay crane assignment and specific quay crane assignment problem where quay crane maintenance is involved, and establishes an integer linear programming with the objective of minimising the total turnaround time. Due to the NP-hardness of the problem, CPLEX only solves instances with up to 18 vessels. For solving larger instances, we propose Left-and-Right Vessel Move (LRVM) algorithm and improved Genetic Algorithm (GA). Experimental results reveal that GA slightly outperforms LRVM with respect to solution quality as the solution of LRVM serves as one of the initial chromosomes of GA. LRVM can output feasible solutions within seconds, even for instances with 50 vessels. We further present a sensitivity analysis of preferred berth segments, and make numerical comparison on algorithm performance for the relevant model without quay crane maintenance. Both the models and proposed heuristics in this work help in dealing with the operational management of container terminal resources in practice.

Suggested Citation

  • Feifeng Zheng & Ying Li & Feng Chu & Ming Liu & Yinfeng Xu, 2019. "Integrated berth allocation and quay crane assignment with maintenance activities," International Journal of Production Research, Taylor & Francis Journals, vol. 57(11), pages 3478-3503, June.
  • Handle: RePEc:taf:tprsxx:v:57:y:2019:i:11:p:3478-3503
    DOI: 10.1080/00207543.2018.1539265
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/00207543.2018.1539265
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/00207543.2018.1539265?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Rodrigues, Filipe & Agra, Agostinho, 2022. "Berth allocation and quay crane assignment/scheduling problem under uncertainty: A survey," European Journal of Operational Research, Elsevier, vol. 303(2), pages 501-524.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:tprsxx:v:57:y:2019:i:11:p:3478-3503. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TPRS20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.