IDEAS home Printed from https://ideas.repec.org/a/taf/tprsxx/v57y2019i10p2926-2955.html
   My bibliography  Save this article

Flow shop scheduling problems with assembly operations: a review and new trends

Author

Listed:
  • G. M. Komaki
  • Shaya Sheikh
  • Behnam Malakooti

Abstract

The past few years have witnessed a resurgence of interest in assembly flow shop scheduling as evidenced by increasing number of published articles in this field. A basic assembly flow shop consists of two types of stages: fabrication or machining stage and assembly stage. Machining and assembly stages are composed of either one or a set of machines that are working in parallel. Final products have hierarchical assembly structure with several components and assembly operation(s). The components need to be processed in the machining stage(s) and then assembled based on hierarchical assembly structure. The goal is to find the sequence of jobs that optimises certain objectives. Assembly flow shop scheduling problem has several interesting derivatives and applications in various manufacturing and service industries. This paper provides a consolidated survey of assembly flow shop models with their solution methodology. Finally, the paper concludes by presenting some problems receiving less attention and proposes several salient research opportunities.

Suggested Citation

  • G. M. Komaki & Shaya Sheikh & Behnam Malakooti, 2019. "Flow shop scheduling problems with assembly operations: a review and new trends," International Journal of Production Research, Taylor & Francis Journals, vol. 57(10), pages 2926-2955, May.
  • Handle: RePEc:taf:tprsxx:v:57:y:2019:i:10:p:2926-2955
    DOI: 10.1080/00207543.2018.1550269
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/00207543.2018.1550269
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/00207543.2018.1550269?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Brammer, Janis & Lutz, Bernhard & Neumann, Dirk, 2022. "Permutation flow shop scheduling with multiple lines and demand plans using reinforcement learning," European Journal of Operational Research, Elsevier, vol. 299(1), pages 75-86.
    2. Niloy J. Mukherjee & Subhash C. Sarin & Daniel A. Neira, 2023. "Lot streaming for a two-stage assembly system in the presence of handling costs," Journal of Scheduling, Springer, vol. 26(4), pages 335-351, August.
    3. Chen, Wenchong & Gong, Xuejian & Rahman, Humyun Fuad & Liu, Hongwei & Qi, Ershi, 2021. "Real-time order acceptance and scheduling for data-enabled permutation flow shops: Bilevel interactive optimization with nonlinear integer programming," Omega, Elsevier, vol. 105(C).
    4. Weiwei Cui & Biao Lu, 2020. "A Bi-Objective Approach to Minimize Makespan and Energy Consumption in Flow Shops with Peak Demand Constraint," Sustainability, MDPI, vol. 12(10), pages 1-22, May.
    5. Zikai Zhang & Qiuhua Tang, 2022. "Integrating preventive maintenance to two-stage assembly flow shop scheduling: MILP model, constructive heuristics and meta-heuristics," Flexible Services and Manufacturing Journal, Springer, vol. 34(1), pages 156-203, March.
    6. Ajay Surendrarao Bhongade & Prakash Manohar Khodke & Ateekh Ur Rehman & Manoj Dattatray Nikam & Prathamesh Dattatray Patil & Pramod Suryavanshi, 2023. "Managing Disruptions in a Flow-Shop Manufacturing System," Mathematics, MDPI, vol. 11(7), pages 1-22, April.
    7. Deepak Gupta & Sonia Goel & Neeraj Mangla, 2022. "Optimization of production scheduling in two stage Flow Shop Scheduling problem with m equipotential machines at first stage," International Journal of System Assurance Engineering and Management, Springer;The Society for Reliability, Engineering Quality and Operations Management (SREQOM),India, and Division of Operation and Maintenance, Lulea University of Technology, Sweden, vol. 13(3), pages 1162-1169, June.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:tprsxx:v:57:y:2019:i:10:p:2926-2955. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TPRS20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.