This work analyses the effects of a fixed initial investment in technology or infrastructure on performance-based maintenance contracts. We present a mathematical expression which reflects the trade-off between an upfront technology investment by the vendor and the cost of required future interventions. We develop a mathematical model of a performance-based maintenance contract that uses this technology trade-off expression and determines the value of the contract for each party. Contractually, the client indicates the duration of the contract and the optimal number of maintenance interventions to maximise asset availability; the vendor quotes the cost for the requested interventions. We study how the initial investment and the contract parameters affect the net present value for each party and the supply chain, demonstrating the existence of an optimal relation between the number of preventive maintenance interventions and level of investment. We derive the optimal contract parameters for the client, vendor and chain and show lack of coordination between the parties. To achieve coordination, we present a revenue sharing mechanism which maximises the value for the chain. Finally, an industry study case with data from the mining sector is presented. Results indicate that by investing and coordinating, the entire supply chain can improve the contract NPV by 149.7%.

Suggested Citation

  • R.S. Ulloa & A.F. Mac Cawley & G.A. Santelices & R. Pascual, 2018. "Technology investment effects in performance-based maintenance contracts," International Journal of Production Research, Taylor & Francis Journals, vol. 56(7), pages 2628-2645, April.
  • Handle: RePEc:taf:tprsxx:v:56:y:2018:i:7:p:2628-2645
    DOI: 10.1080/00207543.2017.1374573
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/00207543.2017.1374573
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/00207543.2017.1374573?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Zhang, Zumeng & Ding, Liping & Wang, Chaofan & Dai, Qiyao & Shi, Yin & Zhao, Yujia & Zhu, Yuxuan, 2022. "Do operation and maintenance contracts help photovoltaic poverty alleviation power stations perform better?," Energy, Elsevier, vol. 259(C).

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:tprsxx:v:56:y:2018:i:7:p:2628-2645. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TPRS20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.