IDEAS home Printed from https://ideas.repec.org/a/taf/tprsxx/v55y2017i8p2163-2176.html
   My bibliography  Save this article

A cost minimisation model for joint production and maintenance planning under quality constraints

Author

Listed:
  • Hossein Beheshti Fakher
  • Mustapha Nourelfath
  • Michel Gendreau

Abstract

In this paper, integrated planning of production, imperfect maintenance and process inspections in a multi-machine system is investigated. This system consists of parallel machines which deteriorate with time and they may shift from a primarily in-control state to a degraded state with a higher defective rate or to a failed state. Maintenance scheduling corresponds to a discrete time age-based imperfect maintenance with a large number of maintenance alternatives. Process inspections are considered to detect the current state of the system. Detecting a deteriorated condition initiates the quality check of the related sub-lots, rework of defective items and a process adjustment that brings the machine in its normal conditions. Production planning includes a capacitated lot-sizing problem with multiple products. We propose a joint approach that coordinates the decisions of the three functions, where the objective function minimises the total cost. Evaluation of costs and interacting factors is presented and two heuristic methods are proposed to solve the problem. The results of the joint model are compared to a non-integrated method and a sensitivity analysis is conducted.

Suggested Citation

  • Hossein Beheshti Fakher & Mustapha Nourelfath & Michel Gendreau, 2017. "A cost minimisation model for joint production and maintenance planning under quality constraints," International Journal of Production Research, Taylor & Francis Journals, vol. 55(8), pages 2163-2176, April.
  • Handle: RePEc:taf:tprsxx:v:55:y:2017:i:8:p:2163-2176
    DOI: 10.1080/00207543.2016.1201605
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/00207543.2016.1201605
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/00207543.2016.1201605?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Tambe, Pravin P. & Kulkarni, Makarand S., 2022. "A reliability based integrated model of maintenance planning with quality control and production decision for improving operational performance," Reliability Engineering and System Safety, Elsevier, vol. 226(C).
    2. Xia, Tangbin & Dong, Yifan & Xiao, Lei & Du, Shichang & Pan, Ershun & Xi, Lifeng, 2018. "Recent advances in prognostics and health management for advanced manufacturing paradigms," Reliability Engineering and System Safety, Elsevier, vol. 178(C), pages 255-268.
    3. Boumallessa, Zeineb & Chouikhi, Houssam & Elleuch, Mounir & Bentaher, Hatem, 2023. "Modeling and optimizing the maintenance schedule using dynamic quality and machine condition monitors in an unreliable single production system," Reliability Engineering and System Safety, Elsevier, vol. 235(C).
    4. Kafiabad, Shayan Tavakoli & Kazemi Zanjani, Masoumeh & Nourelfath, Mustapha, 2020. "Integrated planning of operations and on-job training in maintenance logistics networks," Reliability Engineering and System Safety, Elsevier, vol. 199(C).
    5. Azimpoor, Samareh & Taghipour, Sharareh, 2021. "Joint inspection and product quality optimization for a system with delayed failure," Reliability Engineering and System Safety, Elsevier, vol. 215(C).

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:tprsxx:v:55:y:2017:i:8:p:2163-2176. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TPRS20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.