IDEAS home Printed from https://ideas.repec.org/a/taf/tprsxx/v53y2015i19p5742-5754.html
   My bibliography  Save this article

Assessing scheduling policies in a permutation flowshop with common due dates

Author

Listed:
  • Paz Perez-Gonzalez
  • Jose M. Framinan

Abstract

This paper focuses onto a situation arising in most real-life manufacturing environments when scheduling has to be performed periodically. In such a scenario, different scheduling policies can be adopted, being perhaps the most common to assume that, once a set of jobs has been scheduled, their schedule cannot be modified (‘frozen’ schedule). This implies that, when the next set of jobs is to be scheduled, the resources may not be fully available. Another option is assuming that the schedule of the previously scheduled jobs can be modified as long as it does not violate their due date, which has been already possibly committed to the customer. This policy leads to a so-called multi-agent scheduling problem. The goal of this paper is to discern when each policy is more suitable for the case of a permutation flowshop with common due dates. To do so, we carry out an extensive computational study in a test bed specifically designed to control the main factors affecting the policies, so we analyse the solution space of the underlying scheduling problems. The results indicate that, when the due date of the committed jobs is tight, the multi-agent approach does not pay off in view of the difficulty of finding feasible solutions. Moreover, in such cases, the policy of ‘freezing’ the schedule of the jobs leads to a very simple scheduling problem with many good/acceptable solutions. In contrast, when the due date has a medium/high slack, the multi-agent approach is substantially better. Nevertheless, in this latter case, in order to perceive the full advantage of this policy, powerful solution procedures have to be designed, as the structure of the solution space of the latter problem makes extremely hard to find optimal/good solutions.

Suggested Citation

  • Paz Perez-Gonzalez & Jose M. Framinan, 2015. "Assessing scheduling policies in a permutation flowshop with common due dates," International Journal of Production Research, Taylor & Francis Journals, vol. 53(19), pages 5742-5754, October.
  • Handle: RePEc:taf:tprsxx:v:53:y:2015:i:19:p:5742-5754
    DOI: 10.1080/00207543.2014.994077
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/00207543.2014.994077
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/00207543.2014.994077?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. R. Micale & C. M. La Fata & M. Enea & G. La Scalia, 2021. "Regenerative scheduling problem in engineer to order manufacturing: an economic assessment," Journal of Intelligent Manufacturing, Springer, vol. 32(7), pages 1913-1925, October.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:tprsxx:v:53:y:2015:i:19:p:5742-5754. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TPRS20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.