Author
Abstract
Set-up time and batch size reductions cornerstones of Quick Response Manufacturing (QRM) are often viewed as pathways leading to lower workin-process (WIP) inventory levels and reduced manufacturing lead times. However, set-up time and batch size reductions may not always yield such improvements. Increased workload due to the additional set-ups can lead to a violation of the system's capacity constraints and cause system instability, which results in increased manufacturing lead times and WIP inventory levels. A workload balancing model in conjunction with a heuristic model is presented to determine the required set-up time reduction schemes for different levels of batch size reduction. The model is based on the Theory of Constraints to balance the flow line and limit the workload of each workstation such that each workstation meets the reserved capacity constraint. It is shown that a reduction plan determined by the workload balancing model will maintain the cell's system stability and improve its performance. Incorporating the workload balancing and simulation models, a general approach for selecting the most appropriate reduction plan is illustrated through an example of a gear manufacturing cell. The implications for management are: (1) that pre-established levels for set-up time and batch size reductions are not always effective; and (2) that effective reduction plans need to be preceded by system capacity and performance analysis to determine the effects of such reductions prior to implementation.
Suggested Citation
R. R. Gung, 1999.
"A workload balancing model for determining set-up time and batch size reductions in GT flow line workcells,"
International Journal of Production Research, Taylor & Francis Journals, vol. 37(4), pages 769-791, March.
Handle:
RePEc:taf:tprsxx:v:37:y:1999:i:4:p:769-791
DOI: 10.1080/002075499191517
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:tprsxx:v:37:y:1999:i:4:p:769-791. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/TPRS20 .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.