IDEAS home Printed from https://ideas.repec.org/a/taf/oabmxx/v8y2021i1p1927468.html
   My bibliography  Save this article

Relationship between project success and the success factors in public–private partnership projects: A structural equation model

Author

Listed:
  • Usman Ahmad
  • Hamid Waqas
  • Kashif Akram

Abstract

The budgetary pressures, scarcity of resources, and incessant increases in the demand for public services have driven the Malaysian government to involve the private sector in the development of infrastructure through public–private partnership (PPP) projects. Despite the benefits of PPP projects in different regions, including Malaysia, various PPP endeavours are considered unsuccessful for many reasons. However, the evaluation of the success of these projects is not robust because the definition of the PPP project’s success based on its distinct nature is inadequate. Moreover, the reviewed literature has identified critical success factors (CSFs) for PPP projects, but the question remains whether these factors are real success factors. Thus, this study aimed to develop a robust definition of a PPP project success variable, to categorise the CSFs, and to examine the relationship between the CSF categories and the success of the PPP project.To achieve these objectives, this study adopted a mixed research method—specifically, an exploratory sequential research design. First, in implementing this method, interviews were conducted to develop the measurement items for the PPP project’s success. Second, the study conducted a survey to collect the data for the exploratory factor analysis (EFA) of the newly developed PPP project success items and the principal component analysis (PCA) to categorise the CSFs. Third, the study conducted a second survey to examine the relationship between CSFs and PPP project success.The findings indicated that a PPP project’s success can be measured based on four dimensions: time, cost, objects, quality and stakeholders’ satisfaction. Moreover, the study considered quality and stakeholders as one dimension because of the quality phenomenon. The quality phenomenon explains that the delivery of quality services satisfies all the stakeholders. Furthermore, the CSFs were categorised into five groups that significantly affected the success of PPP projects.

Suggested Citation

  • Usman Ahmad & Hamid Waqas & Kashif Akram, 2021. "Relationship between project success and the success factors in public–private partnership projects: A structural equation model," Cogent Business & Management, Taylor & Francis Journals, vol. 8(1), pages 1927468-192, January.
  • Handle: RePEc:taf:oabmxx:v:8:y:2021:i:1:p:1927468
    DOI: 10.1080/23311975.2021.1927468
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/23311975.2021.1927468
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/23311975.2021.1927468?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Nijah Akram & Dr. Syed Sohaib Zubair & Fahad Asghar & Zuhaib Nishtar & Kashif Lodhi, 2023. "Public-Private Partnerships (PPPs) in Construction Projects: A Study on the Utilization, Effectiveness, and Challenges in Pakistan," Bulletin of Business and Economics (BBE), Research Foundation for Humanity (RFH), vol. 12(3), pages 402-409.
    2. Medya Fathi, 2024. "A Structural Equation Model on Critical Risk and Success in Public–Private Partnership: Exploratory Study," JRFM, MDPI, vol. 17(8), pages 1-23, August.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:oabmxx:v:8:y:2021:i:1:p:1927468. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://cogentoa.tandfonline.com/OABM20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.