A combined control scheme for monitoring the frequency and size of an attribute event
Author
Abstract
Suggested Citation
DOI: 10.1080/02664760903207324
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
References listed on IDEAS
- Wu, Zhang & Yang, Mei & Jiang, Wei & Khoo, Michael B.C., 2008. "Optimization designs of the combined Shewhart-CUSUM control charts," Computational Statistics & Data Analysis, Elsevier, vol. 53(2), pages 496-506, December.
Citations
Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
Cited by:
- Ali, Sajid & Pievatolo, Antonio, 2018. "Time and magnitude monitoring based on the renewal reward process," Reliability Engineering and System Safety, Elsevier, vol. 179(C), pages 97-107.
- Sachin Modgil & Rohit Kumar Singh & Cyril Foropon, 2022. "Quality management in humanitarian operations and disaster relief management: a review and future research directions," Annals of Operations Research, Springer, vol. 319(1), pages 1045-1098, December.
- Shamstabar, Yousof & Shahriari, Hamid & Samimi, Yaser, 2021. "Reliability monitoring of systems with cumulative shock-based deterioration process," Reliability Engineering and System Safety, Elsevier, vol. 216(C).
Most related items
These are the items that most often cite the same works as this one and are cited by the same works as this one.- Maravelakis, Petros E. & Castagliola, Philippe, 2009. "An EWMA chart for monitoring the process standard deviation when parameters are estimated," Computational Statistics & Data Analysis, Elsevier, vol. 53(7), pages 2653-2664, May.
- Wu, Zhang & Yang, Mei & Khoo, Michael B.C. & Castagliola, Philippe, 2011. "What are the best sample sizes for the Xbar and CUSUM charts?," International Journal of Production Economics, Elsevier, vol. 131(2), pages 650-662, June.
- Lei Yong Lee & Michael Boon Chong Khoo & Sin Yin Teh & Ming Ha Lee, 2015. "A Variable Sampling Interval Synthetic Xbar Chart for the Process Mean," PLOS ONE, Public Library of Science, vol. 10(5), pages 1-18, May.
- Lee, Pei-Hsi, 2013. "Joint statistical design of X¯ and s charts with combined double sampling and variable sampling interval," European Journal of Operational Research, Elsevier, vol. 225(2), pages 285-297.
- Chen, Yinuo & Tian, Zhigang & He, Rui & Wang, Yifei & Xie, Shuyi, 2023. "Discovery of potential risks for the gas transmission station using monitoring data and the OOBN method," Reliability Engineering and System Safety, Elsevier, vol. 232(C).
- Ou, Yanjing & Wu, Zhang & Tsung, Fugee, 2012. "A comparison study of effectiveness and robustness of control charts for monitoring process mean," International Journal of Production Economics, Elsevier, vol. 135(1), pages 479-490.
More about this item
Keywords
quality control; statistical process control; control chart; time between events; attribute event;All these keywords.
Statistics
Access and download statisticsCorrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:japsta:v:37:y:2010:i:12:p:1991-2013. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
If CitEc recognized a bibliographic reference but did not link an item in RePEc to it, you can help with this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/CJAS20 .
Please note that corrections may take a couple of weeks to filter through the various RePEc services.