Author
Listed:
- Kai Chen
- Jian Zhao
- Yunfei Zhao
- Changwei Yang
- Ming Li
Abstract
ObjectiveTo simulate the process of curve correction with different strategies of pedicle screws placement, and then explore the ideal strategy. Materials and methods: A three-dimensional model was constructed using CT data from a Lenke 1 AIS patient for finite element analysis. Five screw-placement strategies were designed, including collocation of consecutive, interval and alternate screws instrumentation in convex or concave side. The whole surgical procedures of screw-placement strategies were simulated. And their influences in the curve correction as well as the biomechanics of the implants and implant–bone interface were analyzed. Results: The densities of pedicle screws were 100%, 79%, 64%, 57% and 50%, respectively. During curve correction, interval and alternate screws instrumentation demonstrated higher screws stress, while the higher rods and screw–rod interface was observed in consecutive screws instrumentation. When it referred to the interaction force between screws and vertebrae, a lower stress was observed in in consecutive screws instrumentation. After the fixation of rod at convex side, the maximum stress on screws in each strategy was observed in interval screws instrumentation. The higher stress of rods was observed in alternate screws instrumentation in both sides. However, the correction rate of each strategy was similar. Conclusion: There was little distinction on the curve correction rate in different screw-placement strategies. The screw-placement strategy with interval and alternate screws instrumentation has better biomechanics properties than others, except for higher maximum interaction force between screws and vertebrae.
Suggested Citation
Kai Chen & Jian Zhao & Yunfei Zhao & Changwei Yang & Ming Li, 2021.
"A finite element analysis of different pedicle screw placement strategies for treatment of Lenke 1 adolescent idiopathic scoliosis: which is better?,"
Computer Methods in Biomechanics and Biomedical Engineering, Taylor & Francis Journals, vol. 24(3), pages 270-277, February.
Handle:
RePEc:taf:gcmbxx:v:24:y:2021:i:3:p:270-277
DOI: 10.1080/10255842.2020.1826456
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:gcmbxx:v:24:y:2021:i:3:p:270-277. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/gcmb .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.