Author
Listed:
- Gabriel Castelblanco
- Enrico Maria Fenoaltea
- Alberto De Marco
- Bernardino Chiaia
Abstract
This study explores the relationship between price increase and project cost increase under macroeconomic shocks by considering the hierarchical structure within price categories, diversification of the cost breakdown structure, infrastructure sector, delivery system, construction methods, and type of bid. The analysis of a large construction company with five large projects as embedded units of analysis reveals significant variations in the relative influence of specific factors across the projects. Unit price categories located higher in the hierarchical breakdown structure display lower vulnerability to macroeconomic changes due to their unique and group-specific influencing factors while price categories influenced by macroeconomic factors depart at lower values in the hierarchical structure. Projects with low-cost breakdown structure diversification can either mitigate or exacerbate cost increases depending on construction methods (off-site or on-site), price drivers of most representative materials (global or local), and delivery systems risk allocation. Under macroeconomic crisis periods, public entities may consider giving high priority to projects more reliant on materials driven by regional dynamics (e.g., concrete pouring) over those driven by global market conditions (e.g., steel, aluminum) while prioritizing integrated delivery systems (e.g., design-build) that promote enhanced collaboration, proactive risk management, aligned incentives, and adaptability for managing complexities and volatilities. Complementary, for projects with higher reliance on global market-driven materials, the results suggest that contractors should prioritize early procurement and acquisition of highly volatile resources in projects under macroeconomic crises.
Suggested Citation
Gabriel Castelblanco & Enrico Maria Fenoaltea & Alberto De Marco & Bernardino Chiaia, 2025.
"Influence of macroeconomic factors on construction costs: an analysis of project cases,"
Construction Management and Economics, Taylor & Francis Journals, vol. 43(3), pages 196-212, March.
Handle:
RePEc:taf:conmgt:v:43:y:2025:i:3:p:196-212
DOI: 10.1080/01446193.2024.2410872
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:43:y:2025:i:3:p:196-212. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.