Author
Listed:
- Jorge Rueda-Benavides
- Douglas Gransberg
- Mohamed Khalafalla
- Cesar Mayorga
Abstract
Public departments of transportation (DOTs) are increasingly adopting alternative contracting methods (ACMs), such as Indefinite Delivery/Indefinite Quantity (IDIQ) agreements, to shorten project delivery and increase scheduling flexibility. However, the challenge remains to decide when an IDIQ contract would offer better value for money in a project compared to the conventional Design-Bid-Build (DBB) method. This paper proposes an IDIQ project selection framework that incorporates expected construction costs to identify suitable candidate projects. Historical bid data, an alternate cost indexing system, nonlinear regression analysis, and the Monte Carlo simulation technique are used to create and compare IDIQ and DBB probabilistic construction cost estimates. The study demonstrates the effectiveness of the framework using a single-award IDIQ granted through the Minnesota Department of Transportation (MnDOT) and past bidding information for projects awarded between January 2008 and April 2015. Additionally, the paper acknowledges the limitations of the study, including its reliance on MnDOT data, the exclusion of non-cost factors, and the assumption of project homogeneity. The study also provides valuable recommendations for future research to address these limitations and enhance the understanding and practical implementation of IDIQ contracting in the construction industry.
Suggested Citation
Jorge Rueda-Benavides & Douglas Gransberg & Mohamed Khalafalla & Cesar Mayorga, 2024.
"Probabilistic cost-based decision-making matrix: IDIQ vs. DBB contracting,"
Construction Management and Economics, Taylor & Francis Journals, vol. 42(1), pages 1-15, January.
Handle:
RePEc:taf:conmgt:v:42:y:2024:i:1:p:1-15
DOI: 10.1080/01446193.2023.2226261
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:42:y:2024:i:1:p:1-15. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.