Author
Listed:
- Phuong H. D. Nguyen
- Dai Q. Tran
- Sai P. K. Bypaneni
Abstract
The highway construction industry has been increasingly using design-build (D-B) project delivery because of its documented benefits. Only limited studies, if any, have compared D-B and traditional design-bid-build (D-B-B) project performance based on the size of projects. The existing gap was addressed by investigating the cost growth, schedule growth, and construction intensity of highway projects delivered under D-B-B and D-B with the project sizes ranging from $2 million to greater than $100 million. These projects were collected from six state departments of transportations in the U.S. with mature D-B programs. Several statistics tests including t-test, Welch’s test, and Mann–Whitney U-test were used to analyze 3888 completed highway construction projects. The results show that D-B produced a lower cost growth than D-B-B in the project size of over $10 million while D-B-B projects had lower cost growth than D-B projects in the project size from $2 million to $10 million. D-B projects also produced less schedule growth than D-B-B projects across all groups of project size. D-B-B projects had a faster work pace than D-B projects in the project size from $2 million to $10 million. The findings contribute to the project delivery body of knowledge by reporting statistically empirical comparisons between D-B-B and D-B project performance controlled by the project size. The findings may help highway agencies better understand how D-B performs under the different sizes of projects in terms of cost growth, schedule growth, and construction intensity.
Suggested Citation
Phuong H. D. Nguyen & Dai Q. Tran & Sai P. K. Bypaneni, 2021.
"Exploring the impact of project size on design-bid-build and design-build project delivery performance in highways,"
Construction Management and Economics, Taylor & Francis Journals, vol. 39(11), pages 879-893, November.
Handle:
RePEc:taf:conmgt:v:39:y:2021:i:11:p:879-893
DOI: 10.1080/01446193.2021.1993289
Download full text from publisher
As the access to this document is restricted, you may want to search for a different version of it.
Corrections
All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:39:y:2021:i:11:p:879-893. See general information about how to correct material in RePEc.
If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.
We have no bibliographic references for this item. You can help adding them by using this form .
If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.
For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .
Please note that corrections may take a couple of weeks to filter through
the various RePEc services.