IDEAS home Printed from https://ideas.repec.org/a/taf/conmgt/v37y2019i7p384-399.html
   My bibliography  Save this article

Effect of project complexity on cost and schedule performance in transportation projects

Author

Listed:
  • Long D. Nguyen
  • Long Le-Hoai
  • Dai Q. Tran
  • Chau N. Dang
  • Chau V. Nguyen

Abstract

Project complexity is a contributing factor to project performance. Understanding how project complexity interacts with management actions and project performance is imperative. This study fills this knowledge gap by empirically exploring the relationship between construction project complexity and project performance and their interaction with resource allocation. Empirical data were collected from 79 transportation projects. Due to its capability to build several regression models by adding independent variables to previous models, moderated hierarchical regression analyses were conducted to identify the underlying effect of resource allocation on the project complexity and performance relationship. The results show that: (i) project complexity was significantly correlated with schedule growth (positive correlation) but not significantly correlated with cost growth; (ii) resource allocation was significantly correlated with schedule growth (negative correlation) but not with cost growth; and (iii) resource allocation had a buffering effect where increasing resource allocation significantly decreases the effect of project complexity on schedule growth. The findings from this study contribute to the extant literature on construction project complexity by empirically showing that the impact of project complexity on schedule performance interacts with the level of resource allocation. This understanding of the role of resource allocation may help construction managers and engineers to better administer and manage their complex transportation projects. The findings also imply that organizations should appropriately evaluate project complexity to allocate necessary resources to achieve project success.

Suggested Citation

  • Long D. Nguyen & Long Le-Hoai & Dai Q. Tran & Chau N. Dang & Chau V. Nguyen, 2019. "Effect of project complexity on cost and schedule performance in transportation projects," Construction Management and Economics, Taylor & Francis Journals, vol. 37(7), pages 384-399, July.
  • Handle: RePEc:taf:conmgt:v:37:y:2019:i:7:p:384-399
    DOI: 10.1080/01446193.2018.1532592
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/01446193.2018.1532592
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01446193.2018.1532592?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Mansoor Shekarian & Mahour Parast, 2021. "Do Entrepreneurship Skills Improve Project Performance? A Project-Based Learning Perspective," Journal of Entrepreneurship and Innovation in Emerging Economies, Entrepreneurship Development Institute of India, vol. 30(2), pages 267-305, September.
    2. Seyed Ashkan Zarghami, 2023. "Deviation from a state of perfect uniformity: An indicator of structural complexity in projects," Systems Research and Behavioral Science, Wiley Blackwell, vol. 40(3), pages 488-500, May.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:37:y:2019:i:7:p:384-399. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.