IDEAS home Printed from https://ideas.repec.org/a/taf/conmgt/v36y2018i8p425-442.html
   My bibliography  Save this article

Bringing planning back into the picture – How can supply chain planning aid in dealing with supply chain-related problems in construction?

Author

Listed:
  • Micael Thunberg
  • Anna Fredriksson

Abstract

There are several supply chain-related problems facing the construction industry, such as poor construction site logistics, lack of communication and trust. These problems can jeopardize construction projects through delays and cost overruns. Supply chain planning, a part of supply chain management (SCM), can be used as a tool to deal with these problems. The purpose of this paper is to study how linkages between common supply chain-related problems in construction can be illustrated and to demonstrate how they could be resolved through supply chain planning. Firstly, we identify how the linkages between common problems can be illustrated, and secondly the role of supply chain planning in resolving these problems. A conceptual model is developed that was verified using three cases with Swedish gypsum and kitchen supply chains. The model is shown to be useful in illustrating how supply chain problems occurring at executional level on-site are related to problems originating in lack of planning at company/pre-construction level. The study thus demonstrates how supply chain planning can aid in resolving supply chain problems. The paper contributes by bringing planning back into the picture and by showing how supply chain planning can help to adopt SCM in construction.

Suggested Citation

  • Micael Thunberg & Anna Fredriksson, 2018. "Bringing planning back into the picture – How can supply chain planning aid in dealing with supply chain-related problems in construction?," Construction Management and Economics, Taylor & Francis Journals, vol. 36(8), pages 425-442, August.
  • Handle: RePEc:taf:conmgt:v:36:y:2018:i:8:p:425-442
    DOI: 10.1080/01446193.2017.1394579
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/01446193.2017.1394579
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01446193.2017.1394579?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Ahmet Anil Sezer & Anna Fredriksson, 2021. "Paving the Path towards Efficient Construction Logistics by Revealing the Current Practice and Issues," Logistics, MDPI, vol. 5(3), pages 1-15, August.
    2. Oskari Lähdeaho & Olli-Pekka Hilmola, 2020. "Business Models Amid Changes in Regulation and Environment: The Case of Finland–Russia," Sustainability, MDPI, vol. 12(8), pages 1-18, April.
    3. Farah Naz & Anna Fredriksson & Linea Kjellsdotter Ivert, 2022. "The Potential of Improving Construction Transport Time Efficiency—A Freight Forwarder Perspective," Sustainability, MDPI, vol. 14(17), pages 1-19, August.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:36:y:2018:i:8:p:425-442. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.