IDEAS home Printed from https://ideas.repec.org/a/taf/conmgt/v36y2018i6p328-347.html
   My bibliography  Save this article

A simulation-based method for effective workface planning of industrial construction projects

Author

Listed:
  • Di Hu
  • Yasser Mohamed
  • Hosein Taghaddos
  • Ulrich (Rick) Hermann

Abstract

The generation of well-defined and moderately sized field installation work packages for the construction workforce, referred to as workface planning, has been recently employed to plan large-scale industrial construction projects under tight schedules. However, traditional CPM-based scheduling of several thousand work packages (e.g. 5000 activities multiply by 10 work packages per activity on average) is a tedious, error prone process. Defining proper logics and controlling congestion among work packages crossing several work areas, and also effective resource allocation over time are other major challenges in workface planning. This paper presents a novel simulation-based framework to implement workface planning for large-scale industrial construction projects. This framework proposes a time-stepped discrete event simulation-based modelling for dynamic resource allocation based on congestion and other constraints on the job site. The proposed method is demonstrated and tested against traditional CPM-based solutions based on an actual case study.

Suggested Citation

  • Di Hu & Yasser Mohamed & Hosein Taghaddos & Ulrich (Rick) Hermann, 2018. "A simulation-based method for effective workface planning of industrial construction projects," Construction Management and Economics, Taylor & Francis Journals, vol. 36(6), pages 328-347, June.
  • Handle: RePEc:taf:conmgt:v:36:y:2018:i:6:p:328-347
    DOI: 10.1080/01446193.2017.1390241
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/01446193.2017.1390241
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01446193.2017.1390241?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:36:y:2018:i:6:p:328-347. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.