IDEAS home Printed from https://ideas.repec.org/a/taf/conmgt/v34y2016i3p160-173.html
   My bibliography  Save this article

An alternative classification of project delivery methods used in the United States building construction industry

Author

Listed:
  • Bryan W. Franz
  • Robert M. Leicht

Abstract

Although many sources describe the project delivery methods available to owners, there is little empirical data on their defining characteristics. The objective of this research was to examine patterns in contract arrangements, procurement practices and compensation terms used in the US building construction industry. Survey data were collected for projects completed between 2008 and 2013 ( N = 204) from owners and contractors belonging to large US professional organizations. A latent class analysis was used to identify five distinct patterns or ‘classes’ based upon eight characteristics of the project delivery process. These classes were defined as: ( I ) late builder and trade involvement, with an open, cost-based selection and lump sum contract (9% of projects in sample); ( II ) late builder and trade involvement, with a prequalified, cost-based selection and lump sum contract (19%); ( III ) early builder and late trade involvement, with a prequalified non-cost based selection and guaranteed maximum price (GMP) contract (26%); ( IV ) early builder and trade involvement, with a prequalified, cost-based selection and lump sum design-build (DB) contract (27%); ( V ) early builder and trade involvement, with a prequalified, non-cost based selection and GMP DB contract (18%). Compared to existing classifications of project delivery methods, these classes are data-driven typologies that represent how participants are procured and organized into a project team. The findings have implications as an alternative classification system in project delivery research and as guidance to owners considering their project delivery options.

Suggested Citation

  • Bryan W. Franz & Robert M. Leicht, 2016. "An alternative classification of project delivery methods used in the United States building construction industry," Construction Management and Economics, Taylor & Francis Journals, vol. 34(3), pages 160-173, March.
  • Handle: RePEc:taf:conmgt:v:34:y:2016:i:3:p:160-173
    DOI: 10.1080/01446193.2016.1183800
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/01446193.2016.1183800
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01446193.2016.1183800?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Jessica A Kaminsky, 2017. "Culturally appropriate organization of water and sewerage projects built through public private partnerships," PLOS ONE, Public Library of Science, vol. 12(12), pages 1-15, December.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:34:y:2016:i:3:p:160-173. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.