IDEAS home Printed from https://ideas.repec.org/a/taf/conmgt/v33y2015i8p625-639.html
   My bibliography  Save this article

Creating a baseline for labour productivity of reinforced concrete building construction in Kuwait

Author

Listed:
  • Abdulaziz M. Jarkas
  • R. Malcolm W. Horner

Abstract

Despite many technological advances, construction remains a labour intensive industry, and labour productivity remains the industry's predominant determinant of performance. However, there is a lack of evidence-based labour productivity 'baselines' with which researchers or industry practitioners can compare the efficiency of the labour force, and subsequently establish sensible benchmarks. A rigorous approach to determining baselines for labour productivity of in situ reinforced concrete trades for major building elements under normal operating conditions in the State of Kuwait has therefore been developed. The data were collected from 208 in situ reinforced concrete building projects between 2006 and 2013. The intermittent observation data collection technique which requires the researcher to carry out weekly site visits to audit site staff daily records was used. Projects observed included residential, office and commercial buildings ranging from 1000 to 15 000 m-super-2 in gross floor area, and US$300 000 to US$21 000 000 in construction cost, located across most major cities and suburbs within the State. For each dataset, the minimum, lower quartile, median, upper quartile and maximum labour productivity values are presented. Whilst the median and inter-quartile range represent the baseline or normal labour productivity range of the related activity, the lower and upper quartiles may be used as benchmarks to identify poor and exceptional performance. Although the metrics are specific to Kuwait, the principles of data collection, analysis and use are generic and could be applied to advantage in other countries.

Suggested Citation

  • Abdulaziz M. Jarkas & R. Malcolm W. Horner, 2015. "Creating a baseline for labour productivity of reinforced concrete building construction in Kuwait," Construction Management and Economics, Taylor & Francis Journals, vol. 33(8), pages 625-639, August.
  • Handle: RePEc:taf:conmgt:v:33:y:2015:i:8:p:625-639
    DOI: 10.1080/01446193.2015.1085651
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/01446193.2015.1085651
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01446193.2015.1085651?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:33:y:2015:i:8:p:625-639. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.