IDEAS home Printed from https://ideas.repec.org/a/taf/conmgt/v33y2015i10p799-817.html
   My bibliography  Save this article

Dynamic demand risk assessment for toll road projects

Author

Listed:
  • Rajaa Alasad
  • Ibrahim Motawa

Abstract

To bridge the gap between supply of and increasing demand for roads, public--private partnership (PPP) concession contracts in which the investment cost is recovered via payments from the end users have been established. Although this mechanism has been seen as an efficient way for road projects to be completed on time and within budget, the demand risk faced during the operation stage has considerably limited this efficiency. Demand depends on a range of interrelated and dynamic factors such as the demographic and economic conditions. In addition, uncertainty is an inherent aspect of most demand-underlying factors which always make demand estimation inaccurate. However, this uncertainty is largely ignored by modellers where a single demand estimate is often used when evaluating the facility. The aim is to develop a system dynamics model to assess demand risk in road projects. The model captures the factors affecting demand and their relationships and simulates their change over time. By employing Monte Carlo simulation, the model assesses the likelihood and potential effect of an event on the outcome and provides a full picture of the various effects of potential risk. The model can help public, private, and financial stakeholders of PPP facilities make more informed decisions.

Suggested Citation

  • Rajaa Alasad & Ibrahim Motawa, 2015. "Dynamic demand risk assessment for toll road projects," Construction Management and Economics, Taylor & Francis Journals, vol. 33(10), pages 799-817, October.
  • Handle: RePEc:taf:conmgt:v:33:y:2015:i:10:p:799-817
    DOI: 10.1080/01446193.2016.1143561
    as

    Download full text from publisher

    File URL: http://hdl.handle.net/10.1080/01446193.2016.1143561
    Download Restriction: Access to full text is restricted to subscribers.

    File URL: https://libkey.io/10.1080/01446193.2016.1143561?utm_source=ideas
    LibKey link: if access is restricted and if your library uses this service, LibKey will redirect you to where you can use your library subscription to access this item
    ---><---

    As the access to this document is restricted, you may want to search for a different version of it.

    Citations

    Citations are extracted by the CitEc Project, subscribe to its RSS feed for this item.
    as


    Cited by:

    1. Bridget Tawiah Badu Eshun & Albert P.C. Chan, 2021. "An Evaluation of Project Risk Dynamics in Sino-Africa Public Infrastructure Delivery; A Causal Loop and Interpretive Structural Modelling Approach (ISM-CLD)," Sustainability, MDPI, vol. 13(19), pages 1-24, September.
    2. A. Sardi & E. Sorano, 2021. "Dynamic Performance Management: An Approach for Managing the Common Goods," Papers 2102.04090, arXiv.org.
    3. Alberto Sardi & Enrico Sorano, 2019. "Dynamic Performance Management: An Approach for Managing the Common Goods," Sustainability, MDPI, vol. 11(22), pages 1-22, November.
    4. Zezhou Wu & Kaijie Yang & Xiaofan Lai & Maxwell Fordjour Antwi-Afari, 2020. "A Scientometric Review of System Dynamics Applications in Construction Management Research," Sustainability, MDPI, vol. 12(18), pages 1-16, September.

    More about this item

    Statistics

    Access and download statistics

    Corrections

    All material on this site has been provided by the respective publishers and authors. You can help correct errors and omissions. When requesting a correction, please mention this item's handle: RePEc:taf:conmgt:v:33:y:2015:i:10:p:799-817. See general information about how to correct material in RePEc.

    If you have authored this item and are not yet registered with RePEc, we encourage you to do it here. This allows to link your profile to this item. It also allows you to accept potential citations to this item that we are uncertain about.

    We have no bibliographic references for this item. You can help adding them by using this form .

    If you know of missing items citing this one, you can help us creating those links by adding the relevant references in the same way as above, for each refering item. If you are a registered author of this item, you may also want to check the "citations" tab in your RePEc Author Service profile, as there may be some citations waiting for confirmation.

    For technical questions regarding this item, or to correct its authors, title, abstract, bibliographic or download information, contact: Chris Longhurst (email available below). General contact details of provider: http://www.tandfonline.com/RCME20 .

    Please note that corrections may take a couple of weeks to filter through the various RePEc services.

    IDEAS is a RePEc service. RePEc uses bibliographic data supplied by the respective publishers.